aboutsummaryrefslogtreecommitdiff
Commit message (Expand)AuthorAgeFilesLines
* docs(spec): resolve timer and desktop-settings panel decisionsCraig Jennings27 hours2-44/+47
* docs(spec): sort formal specs into docs/specs/ with lifecycle statusCraig Jennings27 hours8-7/+49
* chore(todo): reconcile open tasks against shipped panel workCraig Jennings27 hours1-27/+33
* chore(todo): archive completed audio-panel spec to resolvedCraig Jennings30 hours1-9/+8
* chore(todo): close audio panel spec IMPLEMENTED, file manual testsCraig Jennings42 hours2-2/+215
* chore(todo): file three panel tasks from roam captureCraig Jennings2 days1-0/+11
* chore(todo): fix malformed PROPERTIES drawers in three closed tasksCraig Jennings2 days2-3/+7
* chore(todo): archive completed tasks to resolvedCraig Jennings2 days2-382/+369
* chore(todo): instrument-console rebuild complete, spec IMPLEMENTEDCraig Jennings2 days4-16/+1535
* chore(todo): bt panel instrument-console shipped — phase 5 of the rebuildCraig Jennings2 days2-2/+9
* chore(todo): net panel instrument-console shipped — phases 3+4Craig Jennings2 days2-5/+12
* chore(todo): net console layer shipped — phase 2 of the panel rebuildCraig Jennings2 days2-1/+4
* feat(spec): instrument-console rebuild spec for both panels, task wiringCraig Jennings3 days2-0/+150
* chore(todo): record the pty fix-up on the speedtest streaming taskCraig Jennings3 days1-0/+2
* chore(todo): close the bt icon-color and close-button tasksCraig Jennings3 days1-4/+10
* chore(todo): file two bt-panel items from the roam inboxCraig Jennings3 days1-0/+6
* chore(todo): close the tunnel-identification taskCraig Jennings3 days1-2/+5
* chore(todo): close the speedtest streaming task, file its panel manual testCraig Jennings3 days1-2/+10
* chore(todo): close both timer bugs, file their manual dialog testsCraig Jennings3 days1-4/+25
* chore(todo): file four net-panel and timer items from the roam inboxCraig Jennings3 days1-0/+12
* chore(todo): record the online pre-check follow-on on the closed taskCraig Jennings3 days1-0/+2
* chore(todo): record the action-narration follow-on on the closed taskCraig Jennings3 days1-0/+2
* chore(todo): close the net-diagnostics narrate task, shipped in dotfilesCraig Jennings3 days1-2/+5
* chore(todo): file two bluetooth-panel follow-ons from the roam inboxCraig Jennings3 days1-0/+6
* docs(spec): swallow pattern reassigned — the file manager is dirvish, not n...Craig Jennings3 days2-4/+15
* docs(spec): file-manager swallow pattern, native swallow ruled out by testCraig Jennings3 days2-0/+136
* chore(todo): file net-diagnostics verbosity task, daily review batch of 7Craig Jennings3 days1-8/+39
* feat(vpn): wireguard config import for the NM migrationCraig Jennings3 days5-9/+306
* feat(vpn): proton CLI replaces the GTK app, tailscale operator at installCraig Jennings3 days2-3/+41
* docs(spec): tunnels phase 4 shippedCraig Jennings3 days1-2/+2
* docs(spec): tunnels phase 3 shippedCraig Jennings3 days1-2/+2
* docs(spec): tunnels phase 2 shippedCraig Jennings3 days1-2/+2
* docs(spec): tunnels phase 1 shipped, proton CLI ground truth notedCraig Jennings3 days1-2/+2
* docs(spec): tunnels spec reviewed READY and decomposed to DOINGCraig Jennings3 days2-5/+38
* feat(packages): retire zoom, meetings open in the browserCraig Jennings3 days3-7/+11
* chore(todo): archive completed tasks to Resolved, age out to task-archiveCraig Jennings3 days2-424/+391
* docs(todo): record the speedrun's stow-hardening ship on the conflicts taskCraig Jennings3 days1-0/+2
* feat(errors): actionable fatals, log-capture for direct mutationsCraig Jennings3 days2-38/+58
* feat(preflight): add NVIDIA/Wayland check with driver-version gateCraig Jennings3 days3-7/+242
* feat(tooling): provision eask via user-local npm installCraig Jennings3 days3-1/+21
* chore(pocketbook)!: remove the in-tree pocketbook packageCraig Jennings3 days19-1059/+9
* docs(todo): file the audio-panel spec task from the roam inboxCraig Jennings3 days1-0/+3
* feat(bluetooth): prove the fresh-install panel wiring in VM assertionsCraig Jennings3 days3-8/+59
* feat(bluetooth): retire blueman, assert the swap in VM testsCraig Jennings3 days4-3/+38
* docs(spec): bluetooth phase 3 shipped, visual batch closedCraig Jennings3 days2-2/+20
* docs(spec): net-panel keyboard claims verified live, false ones struckCraig Jennings3 days2-3/+12
* docs(spec): bluetooth phase 2 shipped, AT-SPI smoke deferred until meeting endsCraig Jennings3 days2-2/+19
* docs(spec): bluetooth phase 1 shipped, pw-dump ground truth noted, css factor...Craig Jennings3 days2-4/+22
* docs(spec): bluetooth panel reviewed READY, decomposed to DOING; net-panel kb...Craig Jennings3 days2-6/+82
* docs(todo): close net-panel toast bug, fixed in dotfilesCraig Jennings3 days1-2/+3