aboutsummaryrefslogtreecommitdiff
Commit message (Expand)AuthorAgeFilesLines
* feat(install): install maintenance thresholds and enable maint timersCraig Jennings34 hours2-1/+75
* chore: close build Phase 12 in todo, file zfs DKMS image bugCraig Jennings34 hours1-2/+5
* test(maint): add VM and nspawn remedy scenario harnessCraig Jennings34 hours13-1/+1138
* chore: log maint refactor sweep in todoCraig Jennings35 hours1-0/+3
* chore: close build Phase 11b in todoCraig Jennings36 hours1-2/+3
* chore: close build Phase 11, add fidelity phase 11bCraig Jennings37 hours2-2/+9
* chore: close build Phase 10 in todoCraig Jennings37 hours1-2/+3
* chore: close build Phase 9 in todoCraig Jennings38 hours1-2/+3
* chore: log build Phase 9a in todoCraig Jennings39 hours1-1/+4
* chore: close build Phase 8 in todoCraig Jennings39 hours1-2/+3
* chore: close build Phase 7 in todoCraig Jennings40 hours1-2/+2
* chore: close build Phase 6 in todoCraig Jennings41 hours1-2/+2
* feat: Phase 6 threshold keys (update guard, session-critical, quarterly)Craig Jennings41 hours1-0/+24
* chore: close build Phase 5 in todoCraig Jennings41 hours1-2/+2
* feat: Phase 5 threshold keys (network, backups, services)Craig Jennings41 hours1-0/+8
* feat: Phase 4 threshold keys (logs, memory, power)Craig Jennings42 hours2-2/+14
* feat: Phase 3 threshold keys, arch-audit dep, btrfs scrub timerCraig Jennings42 hours3-2/+39
* feat: storage threshold keys + close build Phase 2Craig Jennings43 hours2-2/+8
* feat: seed maintenance-thresholds.toml + close build Phase 1Craig Jennings44 hours2-2/+89
* docs: maintenance-console spec to DOING + build decompositionCraig Jennings44 hours2-2/+399
* docs: add maintenance console design + interactive prototypesCraig Jennings46 hours11-0/+5679
* docs: PTT waybar-indicator prototypeCraig Jennings3 days1-0/+133
* docs: per-device activity lamp shipped (audio metering option 3)Craig Jennings3 days2-2/+15
* docs: audio-panel signal-metering spec (implemented)Craig Jennings3 days2-8/+268
* docs: archive shipped panel-bug batch; track system-monitor design captureCraig Jennings4 days2-16/+1023
* docs(todo): close instrument-console panel bug batch (all 8 shipped)Craig Jennings4 days1-16/+15
* docs(todo): file instrument-console panel bugs from inboxCraig Jennings4 days1-0/+17
* docs(todo): fix Proton CLI sign-in command (signin, not login)Craig Jennings4 days1-1/+1
* fix(wireguard): deactivate imported configs so import never arms a tunnelCraig Jennings4 days1-4/+10
* fix(wireguard): replace dead Proton configs with a working setCraig Jennings4 days11-109/+59
* chore(todo): archive completed waybar and timer tasksCraig Jennings4 days2-82/+76
* docs(timer): record the shipped redesign and flip spec to IMPLEMENTEDCraig Jennings4 days5-90/+1987
* docs(todo): timer panel shipped — spec IMPLEMENTED, task closed, manual tes...Craig Jennings5 days2-9/+41
* docs(spec): timer panel to DOING, fold in the cj-comment build scopeCraig Jennings5 days1-2/+23
* docs(spec): fold the wallpaper-manager input into desktop-settings scopeCraig Jennings5 days1-0/+7
* chore(todo): file driver-health and collapse-glyph follow-upsCraig Jennings5 days1-0/+12
* test(vm): collect network evidence before failing in pre-flight diagnosticsCraig Jennings5 days2-22/+289
* docs: gather panel design prototypes into docs/prototypes/Craig Jennings5 days10-7/+1365
* docs(spec): restore faceplate design edits to desktop-settings specCraig Jennings5 days1-4/+25
* chore(todo): note Phase 4 build handed off to dotfilesCraig Jennings5 days1-0/+1
* docs(spec): resolve timer and desktop-settings panel decisionsCraig Jennings5 days2-44/+47
* docs(spec): sort formal specs into docs/specs/ with lifecycle statusCraig Jennings5 days8-7/+49
* chore(todo): reconcile open tasks against shipped panel workCraig Jennings5 days1-27/+33
* chore(todo): archive completed audio-panel spec to resolvedCraig Jennings5 days1-9/+8
* chore(todo): close audio panel spec IMPLEMENTED, file manual testsCraig Jennings6 days2-2/+215
* chore(todo): file three panel tasks from roam captureCraig Jennings6 days1-0/+11
* chore(todo): fix malformed PROPERTIES drawers in three closed tasksCraig Jennings6 days2-3/+7
* chore(todo): archive completed tasks to resolvedCraig Jennings6 days2-382/+369
* chore(todo): instrument-console rebuild complete, spec IMPLEMENTEDCraig Jennings6 days4-16/+1535
* chore(todo): bt panel instrument-console shipped — phase 5 of the rebuildCraig Jennings6 days2-2/+9