aboutsummaryrefslogtreecommitdiff
Commit message (Expand)AuthorAgeFilesLines
* chore: close build Phase 6 in todoCraig Jennings5 hours1-2/+2
* feat: Phase 6 threshold keys (update guard, session-critical, quarterly)Craig Jennings5 hours1-0/+24
* chore: close build Phase 5 in todoCraig Jennings6 hours1-2/+2
* feat: Phase 5 threshold keys (network, backups, services)Craig Jennings6 hours1-0/+8
* feat: Phase 4 threshold keys (logs, memory, power)Craig Jennings6 hours2-2/+14
* feat: Phase 3 threshold keys, arch-audit dep, btrfs scrub timerCraig Jennings7 hours3-2/+39
* feat: storage threshold keys + close build Phase 2Craig Jennings8 hours2-2/+8
* feat: seed maintenance-thresholds.toml + close build Phase 1Craig Jennings8 hours2-2/+89
* docs: maintenance-console spec to DOING + build decompositionCraig Jennings8 hours2-2/+399
* docs: add maintenance console design + interactive prototypesCraig Jennings10 hours11-0/+5679
* docs: PTT waybar-indicator prototypeCraig Jennings35 hours1-0/+133
* docs: per-device activity lamp shipped (audio metering option 3)Craig Jennings42 hours2-2/+15
* docs: audio-panel signal-metering spec (implemented)Craig Jennings42 hours2-8/+268
* docs: archive shipped panel-bug batch; track system-monitor design captureCraig Jennings2 days2-16/+1023
* docs(todo): close instrument-console panel bug batch (all 8 shipped)Craig Jennings2 days1-16/+15
* docs(todo): file instrument-console panel bugs from inboxCraig Jennings3 days1-0/+17
* docs(todo): fix Proton CLI sign-in command (signin, not login)Craig Jennings3 days1-1/+1
* fix(wireguard): deactivate imported configs so import never arms a tunnelCraig Jennings3 days1-4/+10
* fix(wireguard): replace dead Proton configs with a working setCraig Jennings3 days11-109/+59
* chore(todo): archive completed waybar and timer tasksCraig Jennings3 days2-82/+76
* docs(timer): record the shipped redesign and flip spec to IMPLEMENTEDCraig Jennings3 days5-90/+1987
* docs(todo): timer panel shipped — spec IMPLEMENTED, task closed, manual tes...Craig Jennings3 days2-9/+41
* docs(spec): timer panel to DOING, fold in the cj-comment build scopeCraig Jennings3 days1-2/+23
* docs(spec): fold the wallpaper-manager input into desktop-settings scopeCraig Jennings3 days1-0/+7
* chore(todo): file driver-health and collapse-glyph follow-upsCraig Jennings3 days1-0/+12
* test(vm): collect network evidence before failing in pre-flight diagnosticsCraig Jennings4 days2-22/+289
* docs: gather panel design prototypes into docs/prototypes/Craig Jennings4 days10-7/+1365
* docs(spec): restore faceplate design edits to desktop-settings specCraig Jennings4 days1-4/+25
* chore(todo): note Phase 4 build handed off to dotfilesCraig Jennings4 days1-0/+1
* docs(spec): resolve timer and desktop-settings panel decisionsCraig Jennings4 days2-44/+47
* docs(spec): sort formal specs into docs/specs/ with lifecycle statusCraig Jennings4 days8-7/+49
* chore(todo): reconcile open tasks against shipped panel workCraig Jennings4 days1-27/+33
* chore(todo): archive completed audio-panel spec to resolvedCraig Jennings4 days1-9/+8
* chore(todo): close audio panel spec IMPLEMENTED, file manual testsCraig Jennings4 days2-2/+215
* chore(todo): file three panel tasks from roam captureCraig Jennings5 days1-0/+11
* chore(todo): fix malformed PROPERTIES drawers in three closed tasksCraig Jennings5 days2-3/+7
* chore(todo): archive completed tasks to resolvedCraig Jennings5 days2-382/+369
* chore(todo): instrument-console rebuild complete, spec IMPLEMENTEDCraig Jennings5 days4-16/+1535
* chore(todo): bt panel instrument-console shipped — phase 5 of the rebuildCraig Jennings5 days2-2/+9
* chore(todo): net panel instrument-console shipped — phases 3+4Craig Jennings5 days2-5/+12
* chore(todo): net console layer shipped — phase 2 of the panel rebuildCraig Jennings5 days2-1/+4
* feat(spec): instrument-console rebuild spec for both panels, task wiringCraig Jennings5 days2-0/+150
* chore(todo): record the pty fix-up on the speedtest streaming taskCraig Jennings5 days1-0/+2
* chore(todo): close the bt icon-color and close-button tasksCraig Jennings5 days1-4/+10
* chore(todo): file two bt-panel items from the roam inboxCraig Jennings5 days1-0/+6
* chore(todo): close the tunnel-identification taskCraig Jennings5 days1-2/+5
* chore(todo): close the speedtest streaming task, file its panel manual testCraig Jennings5 days1-2/+10
* chore(todo): close both timer bugs, file their manual dialog testsCraig Jennings5 days1-4/+25
* chore(todo): file four net-panel and timer items from the roam inboxCraig Jennings5 days1-0/+12
* chore(todo): record the online pre-check follow-on on the closed taskCraig Jennings5 days1-0/+2