aboutsummaryrefslogtreecommitdiff
path: root/archive/task-archive.org
Commit message (Collapse)AuthorAgeFilesLines
* chore(todo): file the obsbot guard poll bug and archive resolved workHEADmainCraig Jennings25 hours1-0/+20
| | | | | | obsbot-wb-guard runs from the shared stow tier, so it starts on machines with no OBSBOT and polls every two seconds forever doing nothing. The task carries the ConditionPathExists fix and the grading, plus the trap that disabling a linked unit by hand deletes its stow symlink. Three resolved subtrees moved to the archive.
* chore: rebuild velox and file what the reinstall exposedCraig Jennings3 days1-0/+36
| | | | | | The mainboard swap left no boot entry, so I reinstalled from the archangel ISO rather than repairing a ZFS-root machine a stock USB can't read. Ran it as a disaster-recovery drill: microcode, keys, repos, and data are back, and hibernate now works end to end on a 100G encrypted swap. The tasks are most of what this bought. Reseating the input-cover ribbon is [#A] for today, because four phantom power-button presses and the dead touchpad are one loose connector, and the last one cut power below systemd. The rescued emacs-wttrin bundle rides along until it lands on its remote; the runbook stays until velox is settled.
* chore: archive resolved backlog tasks and note probe-flake recurrenceCraig Jennings2026-07-181-0/+138
| | | | Moved the completed maintenance, audio, and timer tasks into the archive, applied the lint counter fixes, and logged the batch-6/batch-9 fader-drag probe-flake recurrences on the existing tracking task.
* chore: archive completed tasks and file two cross-needle referencesCraig Jennings2026-07-131-0/+48
| | | | Wrap cleanup moved the closed net/bt panel tasks into the archive. Two reference photos (weather-station comfort meter, SWR forward/reflected meter) are filed for the next catalogue pass — both look N13-covered.
* chore: file roam inbox items and archive resolved workCraig Jennings2026-07-111-0/+510
| | | | Filed two archsetup tasks from the roam inbox (net panel enterprise-error banner that never dismisses, notification popup sizing). Archived three resolved subtrees into task-archive and ran the todo-cleanup passes (convert-subtasks, archive-done, child-priority sync).
* chore(todo): archive completed and cancelled tasksCraig Jennings2026-07-091-0/+177
|
* chore(todo): archive completed waybar and timer tasksCraig Jennings2026-07-051-0/+43
| | | | The wrap archive pass relocated finished DONE/CANCELLED tasks out of Open Work — six into the Resolved section, four into the task archive — including the timer GTK panel now that the redesign shipped and its live testing settled.
* chore(todo): archive completed tasks to resolvedCraig Jennings2026-07-031-0/+72
| | | | Move the finished level-2 tasks (the instrument-console rebuild and its folded children, the timer fixes, the net/bt panel items, the Testinfra migration) from Open Work into Resolved.
* chore(todo): archive completed tasks to Resolved, age out to task-archiveCraig Jennings2026-07-021-0/+120
|
* chore: archive completed tasks and age resolved history to a fileCraig Jennings2026-06-301-0/+462
Completed work moves from Open Work into Resolved; Resolved entries past the retention window age out to archive/task-archive.org to keep todo.org lean.