summaryrefslogtreecommitdiff
path: root/modules/system-utils.el
diff options
context:
space:
mode:
authorCraig Jennings <c@cjennings.net>2025-11-17 02:54:02 -0600
committerCraig Jennings <c@cjennings.net>2025-11-17 02:54:02 -0600
commit7359ab762a668762fd3d8f2da492b4986962bd62 (patch)
tree08178068136b5bdf2847921cf14b65cce7f09f5a /modules/system-utils.el
parentc4a6f32361654d3f8f992830a0df8a04386075f6 (diff)
downloaddotemacs-7359ab762a668762fd3d8f2da492b4986962bd62.tar.gz
dotemacs-7359ab762a668762fd3d8f2da492b4986962bd62.zip
fix(calendar-sync): Remove carriage return characters from synced events
Problem: Google Calendar .ics files use CRLF line endings (RFC 5545 spec), which resulted in 11,685 ^M (CR) characters appearing in gcal.org, particularly at the end of org header lines. Solution: - Created calendar-sync--normalize-line-endings function to strip all \r characters from .ics content - Integrated into calendar-sync--fetch-ics immediately after curl download - Ensures clean Unix LF-only line endings throughout parsing pipeline Testing: - Added comprehensive test suite: test-calendar-sync--normalize-line-endings.el - 16 tests covering Normal, Boundary, and Error cases - All 56 existing calendar-sync tests still pass (no regressions) - Verified: gcal.org now has 0 CR characters (was 11,685) Files modified: - modules/calendar-sync.el: Added normalize function, updated fetch function - tests/test-calendar-sync--normalize-line-endings.el: New comprehensive test suite
Diffstat (limited to 'modules/system-utils.el')
0 files changed, 0 insertions, 0 deletions