From 0cb17e03af67b58c0493ce539ecb0eced23c6b81 Mon Sep 17 00:00:00 2001 From: Craig Jennings Date: Tue, 23 Jun 2026 23:26:18 -0400 Subject: docs(theme-studio): reconcile stale spec prose with resolved decisions Round-3 Codex review flagged one blocker: summary/readiness/risk text still described the superseded contracts (native color capture, build-inventory.el, dual dir-row sources). Reconciled the Scope tiers, For-the-implementer summary, legend source paragraph, three readiness dimensions, and the Risks section to match the resolved decisions. No decision changed, only the lagging prose. Findings 10/10, decisions 6/6, Ready pending go. --- todo.org | 14 +++++++------- 1 file changed, 7 insertions(+), 7 deletions(-) (limited to 'todo.org') diff --git a/todo.org b/todo.org index 8d22aaf57..cf231f019 100644 --- a/todo.org +++ b/todo.org @@ -60,13 +60,13 @@ Drop the runtime nerd-icons tint so icon color is theme-driven, and add a theme-studio filetype-legend representation over the 34 =nerd-icons-*= color faces (which the inventory already exposes). Spec: [[file:docs/specs/theme-studio-nerd-icons-colors-spec.org][theme-studio-nerd-icons-colors-spec.org]]. -Two Codex spec-review rounds (3 + 6 blocking findings) both incorporated via -spec-response. Round 2 settled the implementer contracts: the explicit 13-row v1 -legend table, dir-color precedence (=nerd-icons-yellow= prepended, wins) and -cross-package ownership (bespoke pane owns only =nerd-icons= faces), the concrete -=nerd-icons-legend.json= artifact + failure behavior, atomic assign+drop-tint -phase order, and a named test plan. Findings [9/9], decisions [6/6]. Spec now -Ready pending Craig's go. Next: confirm Ready → Phase 6 implementation-task breakdown. +Three Codex spec-review rounds (3 + 6 + 1 blocking findings) all incorporated via +spec-response. Round 2 settled the implementer contracts (13-row v1 legend table; +dir precedence =nerd-icons-yellow= prepended wins; cross-package ownership; the +=nerd-icons-legend.json= artifact + failure behavior; atomic assign+drop-tint +phases; named test plan). Round 3 reconciled the stale summary/readiness/risk +prose with those decisions. Findings [10/10], decisions [6/6]. Spec now Ready +pending Craig's go. Next: confirm Ready → Phase 6 implementation-task breakdown. *** TODO [#D] Theme Studio nerd-icons vNext follow-ups :feature: Deferred from [[file:docs/specs/theme-studio-nerd-icons-colors-spec.org][theme-studio-nerd-icons-colors-spec.org]]: extend the legend to buffer-mode and command/symbol categories if the file set proves insufficient; -- cgit v1.2.3