aboutsummaryrefslogtreecommitdiff
path: root/.ai/workflows/open-tasks.org
Commit message (Collapse)AuthorAgeFilesLines
* feat(tasks): surface cross-project dependencies in what's-nextCraig Jennings2026-06-241-1/+15
| | | | | | A task can be blocked by work owed by another project, and today it keeps getting recommended as "next" even though it can't move, while the blocker sits at low priority over there and the dependency stalls silently. Adds a :blocked: tag plus a :BLOCKED_BY: <project>: <what> property (todo-format.md) to mark the dependency, and teaches open-tasks.org Next Mode to pull :blocked: tasks out of the cascade pick and surface them in a dedicated "Blocked on other projects" section that names each blocker and offers an inbox-send nudge. Distinct from VERIFY, which waits on Craig rather than another project. Claude-Session: https://claude.ai/code/session_017PtX1nt1rtYVATuzmzBS4f
* feat(open-tasks): archive-done sweep at start of Phase ACraig Jennings2026-05-281-1/+16
| | | | | | | | | | | | | | | | | | open-tasks.org Phase A now runs `emacs --batch -q -l .ai/scripts/todo-cleanup.el --archive-done todo.org` as a pre-step before the parallel read batch. A level-2 task that completed during the session sits as ** DONE under Open Work until something archives it, which means Next Mode would surface it as a "what's next" candidate between cleanups. The pre-step ensures Phase A's read of todo.org reflects current state. The pre-step skips only in an explicit read-only or dry-run context. Default is always to sweep. Common Mistake #13 records "recommending a freshly-DONE task" with the pointer back to the pre-step. The proposal came from a pearl handoff on 2026-05-28.
* feat(workflows): audit-warranted pre-step + priority and tag enforcementCraig Jennings2026-05-281-17/+87
| | | | | | | | | | | | | | | | | | | Two changes land together because each is broken without the other. open-tasks.org gains a new Phase A.1, evaluated only in Next Mode. The phase reads :LAST_AUDIT: from notes.org and walks five state signals (reminder/task mismatch, passed scheduled date, "waiting on X" matches a shipped X, dead file: link, sub-task >75% DONE coverage). If the temporal threshold of 14 days trips, or any signal fires, Next Mode offers a task-audit run before producing the recommendation. Item 1 in the offer is "run task-audit first" per the recommendation-at-item-1 convention. task-audit.org gains two pieces. Phase C now enforces priority and type-tag presence per the project's legend, applies the [#A] dating rule from that legend, and re-assesses :quick: and :solo: from reconciled facts. Unambiguous calls land autonomously. Ambiguous ones flag NEEDS-USER instead of being guessed. A new Phase E stamps :LAST_AUDIT: on completion.
* refactor(workflows): rename task-review.org to open-tasks.orgCraig Jennings2026-05-201-0/+220
The list-and-pick-next workflow was named task-review.org, but "task review" better describes a list-hygiene habit that re-grades and prunes tasks, not one that just displays them. I'm freeing the task-review.org name (and the "task review" trigger) for that habit, which lands next. This workflow goes back to open-tasks.org — the name it carried before it merged with whats-next.org. Its content and INDEX entry drop the "task review" trigger and point at task-review.org for the hygiene habit. Behavior is unchanged; only the name and the routing phrases move. The rename touches both the canonical workflow and the project mirror.