aboutsummaryrefslogtreecommitdiff
path: root/docs/2026-06-10-modern-cli-tools-evaluation.org
diff options
context:
space:
mode:
authorCraig Jennings <c@cjennings.net>2026-06-29 18:36:47 -0400
committerCraig Jennings <c@cjennings.net>2026-06-29 18:36:47 -0400
commit86724cb0aefd93585241eeb93563e9c7779cdad3 (patch)
tree96814dc414beb3b1cadaa92f97eeed8912d1a2cd /docs/2026-06-10-modern-cli-tools-evaluation.org
parentce9af72ac4a5a6a30443ccdc4d8d785f0fe28c1b (diff)
downloadarchsetup-86724cb0aefd93585241eeb93563e9c7779cdad3.tar.gz
archsetup-86724cb0aefd93585241eeb93563e9c7779cdad3.zip
docs(todo): break the waybar network module into implementation phases
The network spec is Ready, so I decomposed it into one parent task with Phase 1-5 children (indicator + console recovery, panel + connection management, diagnostics + speed test, docs + rollout, VPN vNext), each naming its deliverable, tests, and verification. I consolidated the two source tasks into that parent: the wifi-no-internet task is cancelled (folded in, now Phase 1 + Phase 3), and the network-manager task became the parent. I seeded the Phase 1 live checks under Manual testing and validation, since the live network and visual states need real conditions.
Diffstat (limited to 'docs/2026-06-10-modern-cli-tools-evaluation.org')
0 files changed, 0 insertions, 0 deletions