aboutsummaryrefslogtreecommitdiff
path: root/scripts
diff options
context:
space:
mode:
authorCraig Jennings <c@cjennings.net>2026-05-20 21:56:55 -0400
committerCraig Jennings <c@cjennings.net>2026-05-20 21:56:55 -0400
commitc7fa7feca46e081641d9a6c3d4f34799b1683b23 (patch)
tree6a296841cf6de40211acbb1f0ef2882cb027e74c /scripts
parent62e45197bb4d440e002b731715343e565cf50ff3 (diff)
downloadarchsetup-c7fa7feca46e081641d9a6c3d4f34799b1683b23.tar.gz
archsetup-c7fa7feca46e081641d9a6c3d4f34799b1683b23.zip
chore: document a priority scheme and close two tasks in todo.org
I added an A/B/C/D priority scheme to the task list: what each level means, the assignment criteria, and the rule that an [#A] task needs a scheduled or deadline date so priorities stay grounded in time. I also closed two finished tasks: the rm -rf path guard (done, with a pointer to the safe_rm_rf helper and its tests) and the touchpad toggle indicator (spec, implementation, and deploy record).
Diffstat (limited to 'scripts')
0 files changed, 0 insertions, 0 deletions