aboutsummaryrefslogtreecommitdiff
path: root/docs/specs/2026-07-02-desktop-settings-panel-spec.org
diff options
context:
space:
mode:
Diffstat (limited to 'docs/specs/2026-07-02-desktop-settings-panel-spec.org')
-rw-r--r--docs/specs/2026-07-02-desktop-settings-panel-spec.org1
1 files changed, 1 insertions, 0 deletions
diff --git a/docs/specs/2026-07-02-desktop-settings-panel-spec.org b/docs/specs/2026-07-02-desktop-settings-panel-spec.org
index 4618e75..ad01aa0 100644
--- a/docs/specs/2026-07-02-desktop-settings-panel-spec.org
+++ b/docs/specs/2026-07-02-desktop-settings-panel-spec.org
@@ -14,6 +14,7 @@
:PROPERTIES:
:ID: fb7eec22-a214-4568-82c4-903612f4832f
:END:
+- [2026-07-22 Wed] IMPLEMENTED — post-ship correction (dotfiles ba3ec5e): the CLOCK channel now projects the garage clock itself — the clock package gained a wallpaper mode and settings-project run clock execs it; faces/clock.html (the off-spec SVG dial phase 4 shipped) is deleted. Enforces the clock-channel backing decision: one owner per clock design. Verified live on a headless output (PNG face, ticking seconds, clean stop; panel service untouched).
- [2026-07-22 Wed] IMPLEMENTED — all four phases shipped in dotfiles: 7a15237 (phase 1, backings engine), 74f723e (bar slice, landed early), 5172289 (phase 2, presenters), 33d82eb (phase 3, GTK port of prototype 37), 680b50d (phase 4, projected faces / night watch / location / tick), 9038eee (the 17-point end-to-end pass re-derived from prototype 37's suite). Full dotfiles suite green (85 suites), AT-SPI smoke 13/13, e2e 17/17 on the live compositor. The Cairo drag gestures and the locked-path night-watch swap are on todo.org's "Manual testing and validation" checklist — human-eye checks, not blockers. Build adaptations from the phase logs: five-stage idle dial (WATCH ran as its own stage), held-to-unpause DND, no-backlight drums dim out, kiosk profile wiped per start, reveal gating pid-matched.
- [2026-07-22 Wed] DOING — spec-response: the four rewritten implementation phases decomposed into build tasks in todo.org under a :SPEC_ID:-stamped parent, with the test surface and the final flip-to-IMPLEMENTED task emitted. The build proceeds in dotfiles settings/ per the location decision; archsetup drives.
- [2026-07-22 Wed] READY — spec-review passed (rubric: Ready with caveats; see Review findings — two findings fixed in-run, two non-blocking build-time picks recorded). The prototyping gate closed at prototype 37, sealed by Craig's "Build it. Anything more would be bit fiddling." The FOCUS headphones glyph stands confirmed by the same words. Normative reference: prototype 37.