| Commit message (Expand) | Author | Age | Files | Lines | |
|---|---|---|---|---|---|
| * | docs(spec): net-panel keyboard claims verified live, false ones struck | Craig Jennings | 39 hours | 1 | -2/+7 |
| * | docs: fold Craig's cj comments into the network module spec | Craig Jennings | 3 days | 1 | -4/+55 |
| * | docs: fold the fourth spec review into the network module spec | Craig Jennings | 4 days | 1 | -4/+263 |
| * | docs: bring network module spec current + add diagnostic verbose-capture | Craig Jennings | 4 days | 1 | -44/+222 |
| * | docs: mark waybar network module Phase 1 shipped | Craig Jennings | 4 days | 1 | -2/+18 |
| * | docs: finalize waybar network module spec (reviews incorporated) | Craig Jennings | 4 days | 1 | -135/+1422 |
| * | docs: add unified waybar network module design spec | Craig Jennings | 5 days | 1 | -0/+298 |
