| Commit message (Collapse) | Author | Age | Files | Lines | |
|---|---|---|---|---|---|
| * | chore(todo): net panel instrument-console shipped — phases 3+4 | Craig Jennings | 2026-07-03 | 1 | -5/+9 |
| | | | | | Ticked spec phases 3 and 4 (net view rebuild + interactions, dotfiles 800ef60) and logged the dated todo entry. Phases combined into one commit because a view-only intermediate is a broken panel. BT panel (phase 5) next. | ||||
| * | chore(todo): net console layer shipped — phase 2 of the panel rebuild | Craig Jennings | 2026-07-03 | 1 | -1/+1 |
| | | | | | | | Tick spec phase-2 checkbox and record the dotfiles 81ec9c3 build (net GTK-free presenter layer + engine verbs) as a dated entry under the instrument-console parent task. Claude-Session: https://claude.ai/code/session_013xt96EetpueCFriY4jGyfw | ||||
| * | feat(spec): instrument-console rebuild spec for both panels, task wiring | Craig Jennings | 2026-07-03 | 1 | -0/+139 |
