aboutsummaryrefslogtreecommitdiff
path: root/docs/design/2026-07-03-instrument-console-panels-spec.org
Commit message (Collapse)AuthorAgeFilesLines
* chore(todo): instrument-console rebuild complete, spec IMPLEMENTEDCraig Jennings20 hours1-8/+19
| | | | Closed out the panel rebuild. Both panels verified live on velox: 46 suites and both AT-SPI smokes green, the dead-code removal shipped in dotfiles f4e688e, and the render carries the phase-3/4/5 screenshots since no view code changed. Flipped the parent task and its three folded children (network panel redesign, bt switch placement, bt rename) to DONE, ticked the spec's last phase, and flipped the spec to IMPLEMENTED. Filed the approved prototype and the build summary flat into assets/ with dated names, updated the inbound links, and dropped the working dir. The real-device bt interactions (pair, rename, connect, forget, discoverable, power, low-batt badge) can't be auto-driven, so they're a manual-test checklist.
* chore(todo): bt panel instrument-console shipped — phase 5 of the rebuildCraig Jennings21 hours1-2/+6
| | | | | | Ticks spec phase 5 and records the two-commit bt rebuild (dotfiles 5318b34 layer + 66f03d9 view). Phase 6 (live verify + close-outs + IMPLEMENTED) remains. Claude-Session: https://claude.ai/code/session_013xt96EetpueCFriY4jGyfw
* chore(todo): net panel instrument-console shipped — phases 3+4Craig Jennings21 hours1-5/+9
| | | | Ticked spec phases 3 and 4 (net view rebuild + interactions, dotfiles 800ef60) and logged the dated todo entry. Phases combined into one commit because a view-only intermediate is a broken panel. BT panel (phase 5) next.
* chore(todo): net console layer shipped — phase 2 of the panel rebuildCraig Jennings22 hours1-1/+1
| | | | | | Tick spec phase-2 checkbox and record the dotfiles 81ec9c3 build (net GTK-free presenter layer + engine verbs) as a dated entry under the instrument-console parent task. Claude-Session: https://claude.ai/code/session_013xt96EetpueCFriY4jGyfw
* feat(spec): instrument-console rebuild spec for both panels, task wiringCraig Jennings25 hours1-0/+139