aboutsummaryrefslogtreecommitdiff
path: root/docs/design/2026-07-03-instrument-console-panels-spec.org
Commit message (Collapse)AuthorAgeFilesLines
* chore(todo): bt panel instrument-console shipped — phase 5 of the rebuildCraig Jennings2026-07-031-2/+6
| | | | | | Ticks spec phase 5 and records the two-commit bt rebuild (dotfiles 5318b34 layer + 66f03d9 view). Phase 6 (live verify + close-outs + IMPLEMENTED) remains. Claude-Session: https://claude.ai/code/session_013xt96EetpueCFriY4jGyfw
* chore(todo): net panel instrument-console shipped — phases 3+4Craig Jennings2026-07-031-5/+9
| | | | Ticked spec phases 3 and 4 (net view rebuild + interactions, dotfiles 800ef60) and logged the dated todo entry. Phases combined into one commit because a view-only intermediate is a broken panel. BT panel (phase 5) next.
* chore(todo): net console layer shipped — phase 2 of the panel rebuildCraig Jennings2026-07-031-1/+1
| | | | | | Tick spec phase-2 checkbox and record the dotfiles 81ec9c3 build (net GTK-free presenter layer + engine verbs) as a dated entry under the instrument-console parent task. Claude-Session: https://claude.ai/code/session_013xt96EetpueCFriY4jGyfw
* feat(spec): instrument-console rebuild spec for both panels, task wiringCraig Jennings2026-07-031-0/+139