aboutsummaryrefslogtreecommitdiff
path: root/docs/specs/2026-07-07-maintenance-console-spec.org
Commit message (Collapse)AuthorAgeFilesLines
* chore: close maintenance-console build, flip spec to IMPLEMENTEDCraig Jennings9 hours1-2/+3
|
* chore: close build Phase 11, add fidelity phase 11bCraig Jennings12 hours1-0/+3
|
* docs: maintenance-console spec to DOING + build decompositionCraig Jennings20 hours1-0/+346
The spec encodes the converged 2026-07-06/07 design as 13 decisions and 13 phases (CLI-first maint package, four-layer test strategy) and carries its full review trail inside, live-verified on ratio. Late calls landed during authoring: the bar glyph replaces custom/sysmon, doubles as the laptop battery display, and keeps the btop scratchpad on right-click. todo.org now carries the build: 13 phase tasks under a SPEC_ID-stamped parent, the manual-testing collector, the flip-to-IMPLEMENTED closer, and the vNext deferral.