|
|
The spec encodes the converged 2026-07-06/07 design as 13 decisions and 13 phases (CLI-first maint package, four-layer test strategy) and carries its full review trail inside, live-verified on ratio. Late calls landed during authoring: the bar glyph replaces custom/sysmon, doubles as the laptop battery display, and keeps the btop scratchpad on right-click.
todo.org now carries the build: 13 phase tasks under a SPEC_ID-stamped parent, the manual-testing collector, the flip-to-IMPLEMENTED closer, and the vNext deferral.
|