| Commit message (Collapse) | Author | Age | Files | Lines | |
|---|---|---|---|---|---|
| * | docs(specs): add the widget component-generation spec (DRAFT) | Craig Jennings | 15 hours | 1 | -0/+188 |
| The collection phase closed at 84 verified cards, so porting needs a decision procedure before consumer work starts. The spec carries the agreed five phases (demand inventory, web library extraction, Emacs ports, waybar audio pilot, Level-2 generator go/no-go) and records the baked architecture decisions. I left the web library's packaging shape as the one open decision, tracked as a VERIFY in todo.org. The gallery is the prototype evidence, with the R-series history as the iteration record. | |||||
