| Commit message (Collapse) | Author | Age | Files | Lines |
| |
|
|
| |
Dated history line for the finished extraction, the extraction acceptance criterion checked, the appendix's demand-matrix label corrected from Phase 1 to Phase 2 (a leftover from the pre-review phase order), and the consumer design notes that widget CSS ships inside widgets.js via GW_CSS.
|
| |
|
|
| |
spec-review passed with three findings, all pre-agreed and folded in the same pass: the option-1 approval superseded the demand-gated extraction order (extraction now covers the full catalogue ungated, phases 1-2 swapped, decisions 4 and 8 re-scoped), the card-record refactor is now named in phase 1, and stale counts were refreshed (109 cards, R56). Lifecycle DRAFT -> READY -> DOING; phase tasks live under the Retro widget catalogue parent with the spec UUID stamped as :SPEC_ID:.
|
| |
|
|
| |
Craig approved the classic-script widgets.js with a GW namespace as part of the componentization go-ahead. All eight decisions resolved; the spec is ready for review. The build itself waits on his per-card validation pass.
|
|
|
The collection phase closed at 84 verified cards, so porting needs a decision procedure before consumer work starts. The spec carries the agreed five phases (demand inventory, web library extraction, Emacs ports, waybar audio pilot, Level-2 generator go/no-go) and records the baked architecture decisions. I left the web library's packaging shape as the one open decision, tracked as a VERIFY in todo.org. The gallery is the prototype evidence, with the R-series history as the iteration record.
|