* docs: add the run-time privilege model as a doctor decisionCraig Jennings16 hours1-0/+7
* docs: spec the audio doctor's input side, one doctor per directionCraig Jennings28 hours1-0/+15
* docs: close the audio-doctor spec and its taskCraig Jennings32 hours1-1/+21
* docs: close the audio-doctor decisions, spec is READYCraig Jennings45 hours1-1/+1
* docs(todo): close the minimal-tier zsh PATH gapCraig Jennings45 hours1-1/+6
* docs(todo): task-review pass over the oldest-unreviewed batchCraig Jennings46 hours1-7/+19
* docs(todo): one manual-testing parent, and remove the last false bylinesCraig Jennings46 hours1-13/+19
* docs(todo): reconcile the open tasks against realityCraig Jennings46 hours1-62/+93
* docs: correct the audio-doctor spec's timeout claim, close Phase 0Craig Jennings46 hours1-2/+6
* docs: spec the audio panel doctorCraig Jennings47 hours1-1/+4
* docs(todo): close the roam-inbox batchCraig Jennings2 days1-8/+31
* docs: move the host inventories into the org-roam knowledge baseCraig Jennings2 days1-0/+40
* chore(todo): archive completed and cancelled tasksCraig Jennings2 days1-234/+56
* chore(todo): file retention-repair GUI gap taskCraig Jennings3 days1-0/+5
* chore: health-check updates (workflow note, audit stamp, todo entries)Craig Jennings3 days1-0/+5
* chore: close maintenance-console build, flip spec to IMPLEMENTEDCraig Jennings3 days1-8/+9
* chore: close build Phase 12 in todo, file zfs DKMS image bugCraig Jennings3 days1-2/+5
* chore: log maint refactor sweep in todoCraig Jennings3 days1-0/+3
* chore: close build Phase 11b in todoCraig Jennings3 days1-2/+3
* chore: close build Phase 11, add fidelity phase 11bCraig Jennings3 days1-2/+6
* chore: close build Phase 10 in todoCraig Jennings4 days1-2/+3
* chore: close build Phase 9 in todoCraig Jennings4 days1-2/+3
* chore: log build Phase 9a in todoCraig Jennings4 days1-1/+4
* chore: close build Phase 8 in todoCraig Jennings4 days1-2/+3
* chore: close build Phase 7 in todoCraig Jennings4 days1-2/+2
* chore: close build Phase 6 in todoCraig Jennings4 days1-2/+2
* chore: close build Phase 5 in todoCraig Jennings4 days1-2/+2
* feat: Phase 4 threshold keys (logs, memory, power)Craig Jennings4 days1-2/+2
* feat: Phase 3 threshold keys, arch-audit dep, btrfs scrub timerCraig Jennings4 days1-2/+2
* feat: storage threshold keys + close build Phase 2Craig Jennings4 days1-2/+2
* feat: seed maintenance-thresholds.toml + close build Phase 1Craig Jennings4 days1-2/+2
* docs: maintenance-console spec to DOING + build decompositionCraig Jennings4 days1-2/+53
* docs: add maintenance console design + interactive prototypesCraig Jennings4 days1-0/+13
* docs: per-device activity lamp shipped (audio metering option 3)Craig Jennings5 days1-0/+7
* docs: audio-panel signal-metering spec (implemented)Craig Jennings5 days1-8/+42
* docs: archive shipped panel-bug batch; track system-monitor design captureCraig Jennings6 days1-16/+15
* docs(todo): close instrument-console panel bug batch (all 8 shipped)Craig Jennings6 days1-16/+15
* docs(todo): file instrument-console panel bugs from inboxCraig Jennings6 days1-0/+17
* docs(todo): fix Proton CLI sign-in command (signin, not login)Craig Jennings6 days1-1/+1
* fix(wireguard): replace dead Proton configs with a working setCraig Jennings6 days1-2/+2
* chore(todo): archive completed waybar and timer tasksCraig Jennings6 days1-82/+33
* docs(timer): record the shipped redesign and flip spec to IMPLEMENTEDCraig Jennings6 days1-43/+62
* docs(todo): timer panel shipped — spec IMPLEMENTED, task closed, manual tes...Craig Jennings7 days1-6/+37
* chore(todo): file driver-health and collapse-glyph follow-upsCraig Jennings7 days1-0/+12
* docs: gather panel design prototypes into docs/prototypes/Craig Jennings7 days1-2/+2
* chore(todo): note Phase 4 build handed off to dotfilesCraig Jennings7 days1-0/+1
* docs(spec): sort formal specs into docs/specs/ with lifecycle statusCraig Jennings7 days1-7/+7
* chore(todo): reconcile open tasks against shipped panel workCraig Jennings7 days1-27/+33
* chore(todo): archive completed audio-panel spec to resolvedCraig Jennings7 days1-9/+8
* chore(todo): close audio panel spec IMPLEMENTED, file manual testsCraig Jennings8 days1-2/+55