aboutsummaryrefslogtreecommitdiff
path: root/todo.org
Commit message (Expand)AuthorAgeFilesLines
* chore: log maint refactor sweep in todoCraig Jennings11 hours1-0/+3
* chore: close build Phase 11b in todoCraig Jennings12 hours1-2/+3
* chore: close build Phase 11, add fidelity phase 11bCraig Jennings13 hours1-2/+6
* chore: close build Phase 10 in todoCraig Jennings13 hours1-2/+3
* chore: close build Phase 9 in todoCraig Jennings14 hours1-2/+3
* chore: log build Phase 9a in todoCraig Jennings15 hours1-1/+4
* chore: close build Phase 8 in todoCraig Jennings15 hours1-2/+3
* chore: close build Phase 7 in todoCraig Jennings16 hours1-2/+2
* chore: close build Phase 6 in todoCraig Jennings17 hours1-2/+2
* chore: close build Phase 5 in todoCraig Jennings18 hours1-2/+2
* feat: Phase 4 threshold keys (logs, memory, power)Craig Jennings18 hours1-2/+2
* feat: Phase 3 threshold keys, arch-audit dep, btrfs scrub timerCraig Jennings19 hours1-2/+2
* feat: storage threshold keys + close build Phase 2Craig Jennings19 hours1-2/+2
* feat: seed maintenance-thresholds.toml + close build Phase 1Craig Jennings20 hours1-2/+2
* docs: maintenance-console spec to DOING + build decompositionCraig Jennings20 hours1-2/+53
* docs: add maintenance console design + interactive prototypesCraig Jennings22 hours1-0/+13
* docs: per-device activity lamp shipped (audio metering option 3)Craig Jennings2 days1-0/+7
* docs: audio-panel signal-metering spec (implemented)Craig Jennings2 days1-8/+42
* docs: archive shipped panel-bug batch; track system-monitor design captureCraig Jennings3 days1-16/+15
* docs(todo): close instrument-console panel bug batch (all 8 shipped)Craig Jennings3 days1-16/+15
* docs(todo): file instrument-console panel bugs from inboxCraig Jennings3 days1-0/+17
* docs(todo): fix Proton CLI sign-in command (signin, not login)Craig Jennings3 days1-1/+1
* fix(wireguard): replace dead Proton configs with a working setCraig Jennings3 days1-2/+2
* chore(todo): archive completed waybar and timer tasksCraig Jennings3 days1-82/+33
* docs(timer): record the shipped redesign and flip spec to IMPLEMENTEDCraig Jennings3 days1-43/+62
* docs(todo): timer panel shipped — spec IMPLEMENTED, task closed, manual tes...Craig Jennings4 days1-6/+37
* chore(todo): file driver-health and collapse-glyph follow-upsCraig Jennings4 days1-0/+12
* docs: gather panel design prototypes into docs/prototypes/Craig Jennings4 days1-2/+2
* chore(todo): note Phase 4 build handed off to dotfilesCraig Jennings4 days1-0/+1
* docs(spec): sort formal specs into docs/specs/ with lifecycle statusCraig Jennings4 days1-7/+7
* chore(todo): reconcile open tasks against shipped panel workCraig Jennings4 days1-27/+33
* chore(todo): archive completed audio-panel spec to resolvedCraig Jennings4 days1-9/+8
* chore(todo): close audio panel spec IMPLEMENTED, file manual testsCraig Jennings5 days1-2/+55
* chore(todo): file three panel tasks from roam captureCraig Jennings5 days1-0/+11
* chore(todo): fix malformed PROPERTIES drawers in three closed tasksCraig Jennings5 days1-3/+3
* chore(todo): archive completed tasks to resolvedCraig Jennings5 days1-382/+297
* chore(todo): instrument-console rebuild complete, spec IMPLEMENTEDCraig Jennings5 days1-8/+50
* chore(todo): bt panel instrument-console shipped — phase 5 of the rebuildCraig Jennings5 days1-0/+3
* chore(todo): net panel instrument-console shipped — phases 3+4Craig Jennings5 days1-0/+3
* chore(todo): net console layer shipped — phase 2 of the panel rebuildCraig Jennings5 days1-0/+3
* feat(spec): instrument-console rebuild spec for both panels, task wiringCraig Jennings6 days1-0/+11
* chore(todo): record the pty fix-up on the speedtest streaming taskCraig Jennings6 days1-0/+2
* chore(todo): close the bt icon-color and close-button tasksCraig Jennings6 days1-4/+10
* chore(todo): file two bt-panel items from the roam inboxCraig Jennings6 days1-0/+6
* chore(todo): close the tunnel-identification taskCraig Jennings6 days1-2/+5
* chore(todo): close the speedtest streaming task, file its panel manual testCraig Jennings6 days1-2/+10
* chore(todo): close both timer bugs, file their manual dialog testsCraig Jennings6 days1-4/+25
* chore(todo): file four net-panel and timer items from the roam inboxCraig Jennings6 days1-0/+12
* chore(todo): record the online pre-check follow-on on the closed taskCraig Jennings6 days1-0/+2
* chore(todo): record the action-narration follow-on on the closed taskCraig Jennings6 days1-0/+2