aboutsummaryrefslogtreecommitdiff
path: root/todo.org
Commit message (Expand)AuthorAgeFilesLines
...
* docs: gather panel design prototypes into docs/prototypes/Craig Jennings7 days1-2/+2
* chore(todo): note Phase 4 build handed off to dotfilesCraig Jennings7 days1-0/+1
* docs(spec): sort formal specs into docs/specs/ with lifecycle statusCraig Jennings7 days1-7/+7
* chore(todo): reconcile open tasks against shipped panel workCraig Jennings7 days1-27/+33
* chore(todo): archive completed audio-panel spec to resolvedCraig Jennings7 days1-9/+8
* chore(todo): close audio panel spec IMPLEMENTED, file manual testsCraig Jennings8 days1-2/+55
* chore(todo): file three panel tasks from roam captureCraig Jennings8 days1-0/+11
* chore(todo): fix malformed PROPERTIES drawers in three closed tasksCraig Jennings8 days1-3/+3
* chore(todo): archive completed tasks to resolvedCraig Jennings8 days1-382/+297
* chore(todo): instrument-console rebuild complete, spec IMPLEMENTEDCraig Jennings8 days1-8/+50
* chore(todo): bt panel instrument-console shipped — phase 5 of the rebuildCraig Jennings8 days1-0/+3
* chore(todo): net panel instrument-console shipped — phases 3+4Craig Jennings8 days1-0/+3
* chore(todo): net console layer shipped — phase 2 of the panel rebuildCraig Jennings8 days1-0/+3
* feat(spec): instrument-console rebuild spec for both panels, task wiringCraig Jennings9 days1-0/+11
* chore(todo): record the pty fix-up on the speedtest streaming taskCraig Jennings9 days1-0/+2
* chore(todo): close the bt icon-color and close-button tasksCraig Jennings9 days1-4/+10
* chore(todo): file two bt-panel items from the roam inboxCraig Jennings9 days1-0/+6
* chore(todo): close the tunnel-identification taskCraig Jennings9 days1-2/+5
* chore(todo): close the speedtest streaming task, file its panel manual testCraig Jennings9 days1-2/+10
* chore(todo): close both timer bugs, file their manual dialog testsCraig Jennings9 days1-4/+25
* chore(todo): file four net-panel and timer items from the roam inboxCraig Jennings9 days1-0/+12
* chore(todo): record the online pre-check follow-on on the closed taskCraig Jennings9 days1-0/+2
* chore(todo): record the action-narration follow-on on the closed taskCraig Jennings9 days1-0/+2
* chore(todo): close the net-diagnostics narrate task, shipped in dotfilesCraig Jennings9 days1-2/+5
* chore(todo): file two bluetooth-panel follow-ons from the roam inboxCraig Jennings9 days1-0/+6
* docs(spec): swallow pattern reassigned — the file manager is dirvish, not n...Craig Jennings9 days1-2/+3
* docs(spec): file-manager swallow pattern, native swallow ruled out by testCraig Jennings9 days1-0/+5
* chore(todo): file net-diagnostics verbosity task, daily review batch of 7Craig Jennings9 days1-8/+39
* feat(vpn): wireguard config import for the NM migrationCraig Jennings9 days1-7/+25
* docs(spec): tunnels phase 4 shippedCraig Jennings9 days1-2/+2
* docs(spec): tunnels phase 3 shippedCraig Jennings9 days1-2/+2
* docs(spec): tunnels phase 2 shippedCraig Jennings9 days1-2/+2
* docs(spec): tunnels phase 1 shipped, proton CLI ground truth notedCraig Jennings9 days1-2/+2
* docs(spec): tunnels spec reviewed READY and decomposed to DOINGCraig Jennings9 days1-3/+27
* feat(packages): retire zoom, meetings open in the browserCraig Jennings9 days1-2/+3
* chore(todo): archive completed tasks to Resolved, age out to task-archiveCraig Jennings9 days1-424/+271
* docs(todo): record the speedrun's stow-hardening ship on the conflicts taskCraig Jennings9 days1-0/+2
* feat(errors): actionable fatals, log-capture for direct mutationsCraig Jennings9 days1-6/+6
* feat(preflight): add NVIDIA/Wayland check with driver-version gateCraig Jennings9 days1-5/+3
* feat(tooling): provision eask via user-local npm installCraig Jennings9 days1-1/+3
* chore(pocketbook)!: remove the in-tree pocketbook packageCraig Jennings9 days1-5/+9
* docs(todo): file the audio-panel spec task from the roam inboxCraig Jennings9 days1-0/+3
* feat(bluetooth): prove the fresh-install panel wiring in VM assertionsCraig Jennings9 days1-6/+7
* feat(bluetooth): retire blueman, assert the swap in VM testsCraig Jennings9 days1-2/+2
* docs(spec): bluetooth phase 3 shipped, visual batch closedCraig Jennings9 days1-2/+2
* docs(spec): net-panel keyboard claims verified live, false ones struckCraig Jennings9 days1-1/+5
* docs(spec): bluetooth phase 2 shipped, AT-SPI smoke deferred until meeting endsCraig Jennings9 days1-2/+2
* docs(spec): bluetooth phase 1 shipped, pw-dump ground truth noted, css factor...Craig Jennings9 days1-3/+3
* docs(spec): bluetooth panel reviewed READY, decomposed to DOING; net-panel kb...Craig Jennings9 days1-3/+27
* docs(todo): close net-panel toast bug, fixed in dotfilesCraig Jennings9 days1-2/+3