summaryrefslogtreecommitdiff
path: root/tests/test-org-refile-build-targets.el
diff options
context:
space:
mode:
authorCraig Jennings <c@cjennings.net>2025-11-17 02:54:02 -0600
committerCraig Jennings <c@cjennings.net>2025-11-17 02:54:02 -0600
commit0afa3fba94157d5e18f9a086e0b67b7cfd2aedf0 (patch)
tree08178068136b5bdf2847921cf14b65cce7f09f5a /tests/test-org-refile-build-targets.el
parentcee86049043be47d82a274a1202641fc0a5c68b4 (diff)
fix(calendar-sync): Remove carriage return characters from synced events
Problem: Google Calendar .ics files use CRLF line endings (RFC 5545 spec), which resulted in 11,685 ^M (CR) characters appearing in gcal.org, particularly at the end of org header lines. Solution: - Created calendar-sync--normalize-line-endings function to strip all \r characters from .ics content - Integrated into calendar-sync--fetch-ics immediately after curl download - Ensures clean Unix LF-only line endings throughout parsing pipeline Testing: - Added comprehensive test suite: test-calendar-sync--normalize-line-endings.el - 16 tests covering Normal, Boundary, and Error cases - All 56 existing calendar-sync tests still pass (no regressions) - Verified: gcal.org now has 0 CR characters (was 11,685) Files modified: - modules/calendar-sync.el: Added normalize function, updated fetch function - tests/test-calendar-sync--normalize-line-endings.el: New comprehensive test suite 🤖 Generated with [Claude Code](https://claude.com/claude-code) Co-Authored-By: Claude <noreply@anthropic.com>
Diffstat (limited to 'tests/test-org-refile-build-targets.el')
0 files changed, 0 insertions, 0 deletions