diff options
| author | Craig Jennings <c@cjennings.net> | 2026-06-16 16:02:21 -0500 |
|---|---|---|
| committer | Craig Jennings <c@cjennings.net> | 2026-06-16 16:02:21 -0500 |
| commit | 1682d03f975177cd6a2a6813a1b22b8f028407b9 (patch) | |
| tree | 192239de8adca0378285401be89f887d3fc21628 /docs/specs | |
| parent | 430fe98b1619b1ea4ba67b56679e0d10e7ab3c6c (diff) | |
| download | dotemacs-1682d03f975177cd6a2a6813a1b22b8f028407b9.tar.gz dotemacs-1682d03f975177cd6a2a6813a1b22b8f028407b9.zip | |
chore(todo): group tasks into module projects and document statuses
I consolidated the loose top-level tasks under module "Open Work" parents for every module with four or more (Theme-Studio, Music, AI), and left tasks that already had subtasks as standalone projects. I marked the top-level container tasks PROJECT, top level only and never deeper, and demoted three PROJECT headings that were buried below the top level back to TODO. The priority scheme now documents every status keyword (TODO, PROJECT, DOING, WAITING, VERIFY, STALLED, DELEGATED, DONE, CANCELLED, FAILED), with PROJECT spelled out as a top-level container. I also routed the studio table-consistency task in from the roam inbox.
Diffstat (limited to 'docs/specs')
0 files changed, 0 insertions, 0 deletions
