aboutsummaryrefslogtreecommitdiff
path: root/scripts/oai-transcribe
diff options
context:
space:
mode:
authorCraig Jennings <c@cjennings.net>2026-06-15 16:25:27 -0500
committerCraig Jennings <c@cjennings.net>2026-06-15 16:25:27 -0500
commitbb9914394dbe3b14d79b0a320571031e00a17907 (patch)
tree480d534f125854271ec4f579722a96eac2442a3b /scripts/oai-transcribe
parent9088f53ce41d46e7883edb4e67567bfb0bcc0fbd (diff)
downloaddotemacs-bb9914394dbe3b14d79b0a320571031e00a17907.tar.gz
dotemacs-bb9914394dbe3b14d79b0a320571031e00a17907.zip
refactor(org-agenda): drop OVERDUE block, lead with the schedule
The daily F8 agenda opened with an OVERDUE block that re-listed every past-due scheduled or deadline task. Those items already show in the SCHEDULE block on today's line, since org-scheduled-past-days and org-deadline-past-days are both 10000. The OVERDUE section was pure duplication. I removed it and moved SCHEDULE to the top so the calendar leads the view. The now-dead cj/org-agenda-skip-subtree-if-not-overdue helper, its header defvar, and the nine tests covering it are gone too.
Diffstat (limited to 'scripts/oai-transcribe')
0 files changed, 0 insertions, 0 deletions