diff options
| author | Craig Jennings <c@cjennings.net> | 2026-06-20 22:22:02 -0400 |
|---|---|---|
| committer | Craig Jennings <c@cjennings.net> | 2026-06-20 22:22:02 -0400 |
| commit | b9d4a9c696b78a7d9fc0e4126ff9e50a6a4a3af7 (patch) | |
| tree | 493b805ac6ba59efb5ca571855ea94a7072dbe94 /scripts/theme-studio/test-face-docs-dump.el | |
| parent | 93c16699304a9349f9678252b70cbc7efd2a4a1f (diff) | |
| download | dotemacs-b9d4a9c696b78a7d9fc0e4126ff9e50a6a4a3af7.tar.gz dotemacs-b9d4a9c696b78a7d9fc0e4126ff9e50a6a4a3af7.zip | |
chore(todo-format): level-2 VERIFY closes terminal, not dated
A resolved VERIFY at level 2 was rewritten to a dated org header (** 2026-... <desc>), following the old "VERIFY dates at all depths" rule. Dated headers at level 2 fall through every tool that keys on the keyword: --archive-done never moves them, task-review never selects them, and they pile up in Open Work.
The rule is now depth-split, matching ordinary tasks. VERIFY dates only at level 3 and deeper. At level 2 it closes with a DONE/CANCELLED keyword plus a CLOSED line, the answer in the body.
I fixed the two existing violations (the Dirvish d/D and C-; b pull-away VERIFYs, reverted from dated ** headers to ** DONE), and closed the two F9 GUI manual-test VERIFYs after confirming them.
Diffstat (limited to 'scripts/theme-studio/test-face-docs-dump.el')
0 files changed, 0 insertions, 0 deletions
