aboutsummaryrefslogtreecommitdiff
path: root/tests/test-ai-term--collapse-split.el
diff options
context:
space:
mode:
authorCraig Jennings <c@cjennings.net>2026-06-20 22:22:02 -0400
committerCraig Jennings <c@cjennings.net>2026-06-20 22:22:02 -0400
commitb9d4a9c696b78a7d9fc0e4126ff9e50a6a4a3af7 (patch)
tree493b805ac6ba59efb5ca571855ea94a7072dbe94 /tests/test-ai-term--collapse-split.el
parent93c16699304a9349f9678252b70cbc7efd2a4a1f (diff)
downloaddotemacs-b9d4a9c696b78a7d9fc0e4126ff9e50a6a4a3af7.tar.gz
dotemacs-b9d4a9c696b78a7d9fc0e4126ff9e50a6a4a3af7.zip
chore(todo-format): level-2 VERIFY closes terminal, not dated
A resolved VERIFY at level 2 was rewritten to a dated org header (** 2026-... <desc>), following the old "VERIFY dates at all depths" rule. Dated headers at level 2 fall through every tool that keys on the keyword: --archive-done never moves them, task-review never selects them, and they pile up in Open Work. The rule is now depth-split, matching ordinary tasks. VERIFY dates only at level 3 and deeper. At level 2 it closes with a DONE/CANCELLED keyword plus a CLOSED line, the answer in the body. I fixed the two existing violations (the Dirvish d/D and C-; b pull-away VERIFYs, reverted from dated ** headers to ** DONE), and closed the two F9 GUI manual-test VERIFYs after confirming them.
Diffstat (limited to 'tests/test-ai-term--collapse-split.el')
0 files changed, 0 insertions, 0 deletions