aboutsummaryrefslogtreecommitdiff
path: root/docs
diff options
context:
space:
mode:
Diffstat (limited to 'docs')
-rw-r--r--docs/specs/google-keep-emacs-integration-spec.org6
1 files changed, 5 insertions, 1 deletions
diff --git a/docs/specs/google-keep-emacs-integration-spec.org b/docs/specs/google-keep-emacs-integration-spec.org
index bd12779eb..91fbeb10a 100644
--- a/docs/specs/google-keep-emacs-integration-spec.org
+++ b/docs/specs/google-keep-emacs-integration-spec.org
@@ -4,7 +4,7 @@
#+TODO: TODO | DONE SUPERSEDED CANCELLED
* Metadata
-| Status | Ready (round 1 review folded in) |
+| Status | Ready (2 review rounds; implementing v1) |
|----------+------------------------------------------------------------|
| Owner | Craig |
|----------+------------------------------------------------------------|
@@ -210,3 +210,7 @@ The immediate next increment after v1 lands. A write subcommand on the bridge (g
- What: independent review against the readiness gate and Phase 4 dimensions, reading calendar-sync.el as the analog. Eight findings (one blocking: the bridge JSON schema; seven non-blocking: data/ path + atomic write, async make-process, the two house helpers, v2 re-fetch, KEEP_ID server id, source-link + archived). Craig accepted all; folded in here. Added the Bridge JSON schema subsection, the calendar-sync-convention reuse, and the Review findings section.
- Why: clears the blocker and the readiness gaps; rubric moves to Ready.
- Artifacts: this spec (Review findings [8/8], Bridge JSON schema).
+** 2026-06-25 Thu @ 01:05:00 -0400 — spec-review (round 2) — reviewer
+- What: fresh readiness pass on the revised spec. Verified the round-1 resolutions are coherent (data/keep.org consistent throughout, the JSON schema is the single referenced contract, the async/sentinel + stderr-token story lines up across Design/Phase 2/acceptance). Confirmed cj/auth-source-secret-value (host &optional user) exists and is buildable as written, and that the data/keep.org constant matches user-constants.el's gcal-file form. No new findings.
+- Why: confirms the spec is implementation-ready after two rounds.
+- Artifacts: this spec. Verdict: Ready.