| Commit message (Collapse) | Author | Age | Files | Lines |
| |
|
|
|
|
|
|
|
|
| |
The main "d" agenda view grows two new blocks. A VERIFICATION block lists tasks in the VERIFY TODO state, placed just above the day's SCHEDULE. An IN-PROGRESS block lists tasks in the DOING TODO state, placed just under SCHEDULE. The full block order is now: OVERDUE -> HIGH PRIORITY -> VERIFICATION -> SCHEDULE -> IN-PROGRESS -> PRIORITY B.
Scope matches the other blocks (every entry in `org-agenda-files`). Scheduled and deadlined entries are included -- a VERIFY task with a date appears in both VERIFICATION and SCHEDULE, mirroring how HIGH PRIORITY behaves. Habits are skipped via `cj/org-skip-subtree-if-habit`; PROJECT-keyword parents wouldn't match `(todo "VERIFY")` exact-state filters anyway, so no extra skip there.
Two new header defvars (`cj/main-agenda-verify-title`, `cj/main-agenda-doing-title`) for symmetry with the existing four. Both blocks reference the shared `cj/--main-agenda-prefix-format` so a format tweak still lands in one place.
Five new tests in `test-org-agenda-config-skip-functions.el` lock the block order, each new block's header / prefix-format / skip-function, and the include-scheduled-entries contract.
|
| |
|
|
|
|
| |
`org-agenda-custom-commands` inlined ` %i %-15:c%?-15t% s` four times across the "d" command's overdue / high-priority / schedule / priority-B blocks. New `cj/--main-agenda-prefix-format` defvar holds the literal once; every block now references the symbol so a format tweak lands in one place.
Regression test walks the "d" command's blocks and asserts each `org-agenda-prefix-format` cell resolves to the shared symbol -- a block that silently diverges fails the check.
|
| |
|
|
|
|
|
|
| |
The "d" command's (agenda ...) block had no org-agenda-skip-function. The global org-agenda-skip-scheduled-if-done is nil. CANCELLED tasks with a SCHEDULED date rendered in the forward-looking schedule unfiltered.
The fix adds an org-agenda-skip-function to the SCHEDULE block: (org-agenda-skip-entry-if 'todo '("CANCELLED")). The scope is deliberate. Only CANCELLED is filtered, not DONE or FAILED. A scheduled DONE task is a record of when something happened and stays visible.
Tests cover the configuration: the form must appear on the agenda block and must not appear on the overdue, hi-pri, or priority-B blocks.
|
|
|
- testutil-org.el: shared dynamic timestamp helpers (days-ago, days-ahead, today)
- org-agenda-config: 31 tests across 2 files (skip functions + add-files)
- org-refile-config: 7 tests for ensure-org-mode validation
- Remove prog-shell from checklist (fully covered by existing 9 tests)
|