diff options
| author | Craig Jennings <c@cjennings.net> | 2026-07-14 02:50:17 -0500 |
|---|---|---|
| committer | Craig Jennings <c@cjennings.net> | 2026-07-14 02:50:17 -0500 |
| commit | f14dd8798842dda026d2613791d77f44c258ade7 (patch) | |
| tree | 2ae0d71b2af6de99b2344409dfeee76412e55a43 /.ai/notes.org | |
| parent | ad5bb0768a76ade4fbcb0f2ab99882478e55f4ba (diff) | |
| download | rulesets-f14dd8798842dda026d2613791d77f44c258ade7.tar.gz rulesets-f14dd8798842dda026d2613791d77f44c258ade7.zip | |
feat(spec): sentry supervisor workflow spec, review-complete
Spec for the overnight hygiene supervisor: ten serialized passes, mkdir-atomic locks with heartbeat under the runtime dir, a host-suffixed unpushed branch, interactive entry gates with no report-only mode, and roam-sync kept as the roam repo's only committer. All 10 decisions and 12 adversarial-review findings are resolved in the file; status stays DRAFT pending a deep read. The build task and three deferrals are filed.
Diffstat (limited to '.ai/notes.org')
| -rw-r--r-- | .ai/notes.org | 4 |
1 files changed, 2 insertions, 2 deletions
diff --git a/.ai/notes.org b/.ai/notes.org index 380d4a8..5ce7047 100644 --- a/.ai/notes.org +++ b/.ai/notes.org @@ -61,7 +61,7 @@ This section tracks decisions that need Craig's input before work can proceed. ** Current Reminders -(None currently — will be added as needed) +- =[2026-07-14]= Review the sentry spec (docs/specs/2026-07-14-sentry-workflow-spec.org) — Craig's explicit ask at wrap: strongly suggest he reviews it before ending the next session. All 12 review findings and 10 decisions are resolved and folded in; the spec is open in his Emacs; the READY flip and the [#B] build task both wait on his deep read. ** Instructions for This Section @@ -82,6 +82,6 @@ Format: Markers maintained by workflows to record when they last ran. Read by other workflows that gate their behavior on freshness. :LAST_AUDIT: 2026-07-04 -:LAST_INBOX_PROCESS: 2026-07-13 (three passes: morning 3 handoffs incl. two shared-asset rule proposals shipped; evening validate-el fix + 4 acks; roam inbox emptied twice, 10 foreign items routed to owners) +:LAST_INBOX_PROCESS: 2026-07-14 (3 handoffs: sentry proposal from work accepted + worked in-session; archsetup FYI acknowledged; lint-followups.org deleted per Craig) Format: one =:MARKER: YYYY-MM-DD= line per workflow. Workflows overwrite their own marker on completion. |
