diff options
| author | Craig Jennings <c@cjennings.net> | 2026-07-01 21:35:16 -0400 |
|---|---|---|
| committer | Craig Jennings <c@cjennings.net> | 2026-07-01 21:35:16 -0400 |
| commit | 19ba7cb40c5a448bb28f0217d8cc4718dd450f91 (patch) | |
| tree | 6eeeaf8e10f701c8daa96d2853f1043d3960f3c2 /.ai/workflows/wrap-it-up.org | |
| parent | c976f5b6166b0596daefa6c6dcfc2b684563e13c (diff) | |
| download | rulesets-19ba7cb40c5a448bb28f0217d8cc4718dd450f91.tar.gz rulesets-19ba7cb40c5a448bb28f0217d8cc4718dd450f91.zip | |
feat(todo-cleanup): add --convert-subtasks dated-rewrite mode
Rewrites every level-3+ DONE/CANCELLED/FAILED heading into a dated event-log entry from its CLOSED cookie, enforcing the todo-format depth rule that interactive closes and --archive-done (level-2 only) leave unapplied. A new lint-org checker (subtask-done-not-dated) flags stragglers, and the clean-todo, wrap-up, open-tasks, and task-review workflows now run the converter before archiving.
Removing the CLOSED cookie keeps a DEADLINE or SCHEDULED cookie that shares its planning line, rather than dropping the whole line.
From the .emacs.d handoff (2026-07-01 convert-subtasks bundle).
Diffstat (limited to '.ai/workflows/wrap-it-up.org')
| -rw-r--r-- | .ai/workflows/wrap-it-up.org | 18 |
1 files changed, 17 insertions, 1 deletions
diff --git a/.ai/workflows/wrap-it-up.org b/.ai/workflows/wrap-it-up.org index 5d2cdd2..4fa5a3a 100644 --- a/.ai/workflows/wrap-it-up.org +++ b/.ai/workflows/wrap-it-up.org @@ -137,6 +137,22 @@ Run the report-only variant first if you want to see what would change without w emacs --batch -q -l .ai/scripts/todo-cleanup.el --check todo.org #+end_src +*** Convert done sub-tasks to dated entries + +#+begin_src bash +[ -f todo.org ] && emacs --batch -q -l .ai/scripts/todo-cleanup.el --convert-subtasks todo.org +#+end_src + +=--convert-subtasks= rewrites every heading at level 3 or deeper whose TODO state is DONE/CANCELLED/FAILED into a dated event-log entry (=<stars> YYYY-MM-DD Day @ HH:MM:SS -ZZZZ <text>=), dropping the keyword, priority cookie, and tags, and removing the now-redundant =CLOSED:= line. This enforces the =todo-format.md= depth rule that a completed *sub-task* (a heading under a parent task) becomes dated history, not a lingering DONE keyword — a shape an interactive org close (=org-log-done= → DONE + CLOSED) never applies and =--archive-done= (level-2 only) never reaches. The timestamp comes from each entry's own =CLOSED= cookie; a date-only close yields =00:00:00=. Heading text is kept verbatim. Idempotent (an already-dated heading has no keyword to match), and a done sub-task with no parseable =CLOSED= is flagged and left alone rather than stamped with a fabricated date. + +Run this *before* =--archive-done= so that when a completed level-2 parent is archived, its sub-tasks already carry their dated form. Any rewrites show up in the wrap-up commit's diff for review before push. + +Preview without writing: + +#+begin_src bash +emacs --batch -q -l .ai/scripts/todo-cleanup.el --convert-subtasks --check todo.org +#+end_src + *** Archive completed work #+begin_src bash @@ -536,7 +552,7 @@ Before considering wrap-up complete: - [ ] The Summary ends with the =KB: promoted N / consulted yes-no= line (promotion check ran) - [ ] File renamed to =.ai/sessions/YYYY-MM-DD-HH-MM-description.org= - [ ] =.ai/session-context.org= no longer exists -- [ ] =todo-cleanup.el= ran — hygiene pass + =--archive-done= + =--sync-child-priority= (if =todo.org= exists at project root) +- [ ] =todo-cleanup.el= ran — hygiene pass + =--convert-subtasks= + =--archive-done= + =--sync-child-priority= (if =todo.org= exists at project root) - [ ] =lint-org.el= ran on =todo.org= — mechanical fixes applied, judgments appended to follow-ups file (if =todo.org= exists) - [ ] Any orphan-planning-line warnings reviewed (fix or accept) - [ ] Inbox carries nothing but expected pipeline artifacts (=.gitkeep=, =lint-followups.org=, =PROCESSED-*= prefixes), OR each remaining handoff has an explicit deferral logged in the valediction |
