aboutsummaryrefslogtreecommitdiff
path: root/claude-rules
diff options
context:
space:
mode:
authorCraig Jennings <c@cjennings.net>2026-07-04 12:38:46 -0500
committerCraig Jennings <c@cjennings.net>2026-07-04 12:38:46 -0500
commit44af1b2ae955a6deac3be75b5d3495b17c8b3ad9 (patch)
tree583955c52fb1124032c1276726f78c6620ce6443 /claude-rules
parent73835a23d94f5746a085eaf444d657fecc9d3ca5 (diff)
downloadrulesets-44af1b2ae955a6deac3be75b5d3495b17c8b3ad9.tar.gz
rulesets-44af1b2ae955a6deac3be75b5d3495b17c8b3ad9.zip
chore(todo): close three tasks the audit confirmed done
The audit found three tasks code-complete with only validation left, so I closed each and flipped its spec to IMPLEMENTED: - Docs-lifecycle convention: all four build phases plus the file-to-id link conversion had shipped. Manual validation and the org-agenda vNext moved out to their own tasks. - Wrap-up inbox/transcript routing: the recommendation engine, the route-candidate marker, the wrap-up router, and route-batch all shipped green. Manual end-to-end validation and transcript filing moved out. - Cross-machine memory sync: verified the sync round-trip live across velox and ratio (a probe made on one reached the other, its deletion propagated back, both clones on one HEAD, no conflicts). The work and unknown-project write-refusal checks moved out. I also stamped the audit marker.
Diffstat (limited to 'claude-rules')
0 files changed, 0 insertions, 0 deletions