aboutsummaryrefslogtreecommitdiff
path: root/docs/specs/wrapup-routing-spec.org
diff options
context:
space:
mode:
authorCraig Jennings <c@cjennings.net>2026-07-04 12:38:46 -0500
committerCraig Jennings <c@cjennings.net>2026-07-04 12:38:46 -0500
commit44af1b2ae955a6deac3be75b5d3495b17c8b3ad9 (patch)
tree583955c52fb1124032c1276726f78c6620ce6443 /docs/specs/wrapup-routing-spec.org
parent73835a23d94f5746a085eaf444d657fecc9d3ca5 (diff)
downloadrulesets-44af1b2ae955a6deac3be75b5d3495b17c8b3ad9.tar.gz
rulesets-44af1b2ae955a6deac3be75b5d3495b17c8b3ad9.zip
chore(todo): close three tasks the audit confirmed done
The audit found three tasks code-complete with only validation left, so I closed each and flipped its spec to IMPLEMENTED: - Docs-lifecycle convention: all four build phases plus the file-to-id link conversion had shipped. Manual validation and the org-agenda vNext moved out to their own tasks. - Wrap-up inbox/transcript routing: the recommendation engine, the route-candidate marker, the wrap-up router, and route-batch all shipped green. Manual end-to-end validation and transcript filing moved out. - Cross-machine memory sync: verified the sync round-trip live across velox and ratio (a probe made on one reached the other, its deletion propagated back, both clones on one HEAD, no conflicts). The work and unknown-project write-refusal checks moved out. I also stamped the audit marker.
Diffstat (limited to 'docs/specs/wrapup-routing-spec.org')
-rw-r--r--docs/specs/wrapup-routing-spec.org5
1 files changed, 3 insertions, 2 deletions
diff --git a/docs/specs/wrapup-routing-spec.org b/docs/specs/wrapup-routing-spec.org
index 1a150fc..1bdc0f3 100644
--- a/docs/specs/wrapup-routing-spec.org
+++ b/docs/specs/wrapup-routing-spec.org
@@ -4,14 +4,15 @@
#+TODO: TODO | DONE
#+TODO: DRAFT READY DOING | IMPLEMENTED SUPERSEDED CANCELLED
-* DOING Wrap-Up Inbox/Transcript Routing — Spec
+* IMPLEMENTED Wrap-Up Inbox/Transcript Routing — Spec
:PROPERTIES:
:ID: 00b47414-2213-4a99-be35-48ceb266fc08
:END:
+- 2026-07-04 Sat @ 11:49:59 -0500 — DOING → IMPLEMENTED: the task-routing build shipped and is green — route_recommend.py (destination discovery + recommendation, 13 unit tests), the :ROUTE_CANDIDATE: marker wired into inbox process mode, the wrap-it-up router sub-step, and the route-batch delivery helper (9 bats tests). Manual cross-project end-to-end validation tracked as its own task; the transcript-filing half stays a deferred vNext.
- 2026-07-02 Thu @ 00:17:01 -0400 — retrofitted by spec-sort; status set to DOING (evidence-based, human-confirmed)
* Metadata
-| Status | doing |
+| Status | implemented |
|----------+-----------------------------------------------------|
| Owner | Craig Jennings |
|----------+-----------------------------------------------------|