aboutsummaryrefslogtreecommitdiff
path: root/docs/specs
diff options
context:
space:
mode:
authorCraig Jennings <c@cjennings.net>2026-07-19 05:05:33 -0500
committerCraig Jennings <c@cjennings.net>2026-07-19 05:05:33 -0500
commit8c0a56bf2d7e81e4876919f120004aa011365327 (patch)
tree5ac5ca06a5fd3a4deef1de05b72c530f9b5788dd /docs/specs
parentc6383e97f7dc1113959a000f6273d30c2f20415e (diff)
downloadrulesets-8c0a56bf2d7e81e4876919f120004aa011365327.tar.gz
rulesets-8c0a56bf2d7e81e4876919f120004aa011365327.zip
chore(sentry): flip spec to IMPLEMENTED and close the build task
Phase 4. All four phases shipped and the suite is green, so the spec keyword moves DOING to IMPLEMENTED with a dated history line and the Metadata Status mirrors it. The build task and its phase sub-tasks close (the sub-tasks become dated event-log entries per the depth rule). The overnight live trial is the one piece an agent can't run, so it's filed as a structured manual-testing task: entry gates with Craig present, one fire observed end to end, the wrap-up guard and stop-sentry, and the morning branch review. Its findings become follow-up tasks rather than gating the flip.
Diffstat (limited to 'docs/specs')
-rw-r--r--docs/specs/2026-07-14-sentry-workflow-spec.org5
1 files changed, 3 insertions, 2 deletions
diff --git a/docs/specs/2026-07-14-sentry-workflow-spec.org b/docs/specs/2026-07-14-sentry-workflow-spec.org
index 6de0137..307d0be 100644
--- a/docs/specs/2026-07-14-sentry-workflow-spec.org
+++ b/docs/specs/2026-07-14-sentry-workflow-spec.org
@@ -4,17 +4,18 @@
#+TODO: TODO | DONE
#+TODO: DRAFT READY DOING | IMPLEMENTED SUPERSEDED CANCELLED
-* DOING sentry workflow
+* IMPLEMENTED sentry workflow
:PROPERTIES:
:ID: f6c51f27-d7a2-4b63-9ff9-5ba005a66dfb
:END:
+- 2026-07-19 Sun @ 05:04:00 -0500 — IMPLEMENTED: all four phases built, committed, and pushed (agent-lock a8b6cf4, engine ccc9c26, companions c6383e9). Full suite green throughout. The overnight live trial is handed to Craig as a structured manual-testing task; its findings file as follow-up tasks, not a build gate.
- 2026-07-19 Sun @ 04:35:57 -0500 — DOING: build started. Decomposed into the four implementation phases as todo.org build tasks under the sentry parent (SPEC_ID-bound); running in no-approvals + auto-flush mode.
- 2026-07-19 Sun @ 04:35:57 -0500 — READY: Craig completed his deep read and approved the spec for build. Gate passed.
- 2026-07-14 Tue @ 02:03:28 -0500 — all 12 review findings dispositioned live with Craig and folded into the design; decisions now 10/10; still DRAFT pending Craig's deep read.
- 2026-07-14 Tue @ 00:52:03 -0500 — drafted, all nine design decisions resolved live with Craig during the authoring session.
* Metadata
-| Status | doing |
+| Status | implemented |
|----------+------------------------------------------|
| Owner | Craig Jennings |
|----------+------------------------------------------|