aboutsummaryrefslogtreecommitdiff
path: root/languages/bash/tests/validate-bash.bats
diff options
context:
space:
mode:
authorCraig Jennings <c@cjennings.net>2026-06-30 13:27:24 -0400
committerCraig Jennings <c@cjennings.net>2026-06-30 13:27:24 -0400
commitd0ab04751fe437b6c9509a2ff3217cda0f624edc (patch)
tree501250177ea7174f38795d693acdac01a8d3351d /languages/bash/tests/validate-bash.bats
parenta266250c1e24c9b2f6f246206c1b726dbb84c4bf (diff)
downloadrulesets-d0ab04751fe437b6c9509a2ff3217cda0f624edc.tar.gz
rulesets-d0ab04751fe437b6c9509a2ff3217cda0f624edc.zip
docs: add a green-baseline-before-work gate to verification and start-work
A red test suite at the start of work poisons every later "did I break this?" check: you can't tell your own regressions from pre-existing noise, and the end-of-work green bar stops being readable. verification.md now asks for a clean suite run before work begins, not only before commit. start-work runs it as Pre-work step 0.3 against the reconciled base. I added two carve-outs the original proposal lacked: a project with no suite has nothing to baseline, and a suite that can't run is the existing "When You Cannot Verify" case rather than a blocker. The step lands after the reconcile, so the baseline reflects the base the work is cut from. The Phase 4 TDD red is called out as expected, distinct from a baseline failure.
Diffstat (limited to 'languages/bash/tests/validate-bash.bats')
0 files changed, 0 insertions, 0 deletions