aboutsummaryrefslogtreecommitdiff
path: root/scripts/install-lang.sh
diff options
context:
space:
mode:
authorCraig Jennings <c@cjennings.net>2026-06-10 15:26:49 -0500
committerCraig Jennings <c@cjennings.net>2026-06-10 15:26:49 -0500
commit34c694567b24c7b22b68acb6e4b9860885eefa76 (patch)
treeee6d38c63625b23f43745d81bba5949b1d7b9ec6 /scripts/install-lang.sh
parente0364b862332112b10eafe80cbba8ad079990095 (diff)
downloadrulesets-34c694567b24c7b22b68acb6e4b9860885eefa76.tar.gz
rulesets-34c694567b24c7b22b68acb6e4b9860885eefa76.zip
feat(workflows): daily-prep carries execution links and join links
A Day's Priorities entry now carries the URL the task is done through (payment portal, doc, PR, form), not just the thin link to its todo.org home. When that URL is missing from the todo.org body, the prep build finds it and adds it to both. Meeting lines in Meetings / Work Blocks get an org link to the join URL from the calendar event's conference data, so joining is one click from the prep doc. Both rules came out of working the 2026-06-10 prep doc, where paying an invoice meant a Gmail dig for the payment URL first.
Diffstat (limited to 'scripts/install-lang.sh')
0 files changed, 0 insertions, 0 deletions