aboutsummaryrefslogtreecommitdiff
path: root/scripts
diff options
context:
space:
mode:
authorCraig Jennings <c@cjennings.net>2026-06-10 00:28:49 -0500
committerCraig Jennings <c@cjennings.net>2026-06-10 00:28:49 -0500
commit78133a3de432c3d1998bc84b41354a8040c9535e (patch)
treec88b89ff373442ea2044184a1028b1ce46ae6370 /scripts
parent891e1ab36aa01358bcd86026450f5a645c4eae11 (diff)
downloadrulesets-78133a3de432c3d1998bc84b41354a8040c9535e.tar.gz
rulesets-78133a3de432c3d1998bc84b41354a8040c9535e.zip
feat(daily-prep): add 5-day look-ahead, daily big-ball, and decline gate
I folded in three additions from the Manager Tools prep research. Phase A now fetches the prep day plus the next 5 days, and a new Phase 1 sub-section scans that window for meetings that need prep, scheduling traps, and focus blocks to protect. It's a scan-and-flag pass that feeds Heads-up and Anchor Tasks, not a new prep-doc section. Phase 3 sub-step 3a pulls one important-but-not-urgent task per day for a 15-minute chunk, so strategic work lands in small daily pieces instead of getting displaced by the urgent. Phase 1 item 5 reframes "attend" as "contribute" and adds a send-regrets gate for meetings with no objective. The look-ahead's meeting-prep references stay conditional ("where the project has one") since meeting-prep is project-only for now.
Diffstat (limited to 'scripts')
0 files changed, 0 insertions, 0 deletions