aboutsummaryrefslogtreecommitdiff
path: root/todo.org
diff options
context:
space:
mode:
authorCraig Jennings <c@cjennings.net>2026-06-12 02:47:22 -0500
committerCraig Jennings <c@cjennings.net>2026-06-12 02:47:22 -0500
commit006711142e4a23da4fc990dc1371807d6200a74e (patch)
treefee561d4c469b7a8006e45d723b61763906e6191 /todo.org
parent5feaa94b3ba6c1ce52742a771d37e3186eb81230 (diff)
downloadrulesets-006711142e4a23da4fc990dc1371807d6200a74e.tar.gz
rulesets-006711142e4a23da4fc990dc1371807d6200a74e.zip
docs(spec): close the helper-spec review cycle on the second pass
The re-review confirmed every disposition with no new high or medium findings: Phase 1.5 stands at Ready with caveats, phases 2-5 stay parked behind the decisions fence. The response is correspondingly small — the accepted editorial rename of the Emacs subsection (its "open issue / blocks readiness" heading outlived the body, which is now an integration contract) and the second-pass note in the dispositions section. The updated review file and its history and task-tracking edits ride along.
Diffstat (limited to 'todo.org')
-rw-r--r--todo.org5
1 files changed, 4 insertions, 1 deletions
diff --git a/todo.org b/todo.org
index 24ef1eb..a473114 100644
--- a/todo.org
+++ b/todo.org
@@ -45,7 +45,7 @@ Cancelled 2026-06-11: Craig confirmed the decision — one todo queue with a sin
:CREATED: [2026-06-11 Thu]
:LAST_REVIEWED: 2026-06-11
:END:
-SPEC REVIEWED 2026-06-12: [[file:docs/design/2026-05-28-generic-agent-runtime-spec-review.org][Codex review]] keeps the whole generic-runtime spec at =Not ready=, but treats Phase 1.5 as implementable as a scoped slice if the caveats below are accepted. Before any build, keep the Emacs integration as a cross-project handoff to =~/.emacs.d=, preserve the three-ring gate (bats → sandbox drills → pilot project), and do not let startup/helper changes reach synced template paths until the live drills pass.
+SPEC REVIEWED 2026-06-12: [[file:docs/design/2026-05-28-generic-agent-runtime-spec-review.org][Codex review]] now rates Phase 1.5 =Ready with caveats=. Before any build, keep the Emacs integration as a cross-project handoff to =~/.emacs.d=, preserve the three-ring gate (bats → sandbox drills → pilot project), and do not let startup/helper changes reach synced template paths until the live drills pass.
Implement Phase 1.5 of the generic-agent-runtime spec ([[file:docs/design/2026-05-28-generic-agent-runtime-spec.org][spec]], amended 2026-06-11 with the "Concurrent same-project agents" section). Craig's case: spawn a second Claude in the same project to look things up or update tasks safely while the primary works. The session-context split (AI_AGENT_ID + session-context.d/) already shipped; this builds the rest:
@@ -1156,6 +1156,9 @@ Craig's motivating case (a second Claude in the same project for lookups and saf
*** 2026-06-12 Fri @ 02:09:10 -0500 Independent spec review complete
Codex ran the spec-review workflow. Outcome: the combined spec is =Not ready= because phases 2-5 still require product decisions and current external-runtime/model verification. Phase 1.5 can proceed only as the already-split helper task, with rollout/manual-validation caveats accepted and no accidental template-wide release before sandbox/pilot drills pass. Review file: [[file:docs/design/2026-05-28-generic-agent-runtime-spec-review.org]].
+*** 2026-06-12 Fri @ 02:39:38 -0500 Second review after response pass
+Codex re-ran spec-review after the dispositions were folded in. Outcome by arc: Phase 1.5 helper instances =Ready with caveats=; phases 2-5 remain =Not ready= behind the explicit decisions/reverification gate. No new blocking findings for the helper slice. Review file updated in place: [[file:docs/design/2026-05-28-generic-agent-runtime-spec-review.org]].
+
* Rulesets Resolved
** DONE [#C] Fix =cj-scan= false positives on cj fences nested inside other =#+begin_*= blocks :bug:
CLOSED: [2026-05-15 Fri]