aboutsummaryrefslogtreecommitdiff
path: root/.ai/notes.org
diff options
context:
space:
mode:
Diffstat (limited to '.ai/notes.org')
-rw-r--r--.ai/notes.org2
1 files changed, 2 insertions, 0 deletions
diff --git a/.ai/notes.org b/.ai/notes.org
index 447c33c..828fde3 100644
--- a/.ai/notes.org
+++ b/.ai/notes.org
@@ -61,6 +61,8 @@ This section tracks decisions that need Craig's input before work can proceed.
** Current Reminders
+- =[2026-07-27]= Finish the context-engineering rightsizing — Craig's explicit ask at wrap. Surface is 57,800 → 28,949 tokens; the remaining work needs *his decisions*, not execution: =verification.md= (C1 — its honesty core vs the Opus 5 over-verification warning), =interaction.md= (3,828 tok, largest remaining), the TDD rationalization table (cut or keep), and D3 the gate separation (which approval gates are preference vs guardrail). Task: "Finish context-engineering rightsizing" in todo.org. Docs in =working/context-engineering-rightsizing/= are one commit behind — reconcile them first.
+
- =[2026-07-14]= Review the sentry spec (docs/specs/2026-07-14-sentry-workflow-spec.org) — Craig's explicit ask at wrap: strongly suggest he reviews it before ending the next session. All 12 review findings and 10 decisions are resolved and folded in; the spec is open in his Emacs; the READY flip and the [#B] build task both wait on his deep read.
** Instructions for This Section