diff options
Diffstat (limited to 'claude-rules')
| -rw-r--r-- | claude-rules/todo-format.md | 7 |
1 files changed, 6 insertions, 1 deletions
diff --git a/claude-rules/todo-format.md b/claude-rules/todo-format.md index 2cdc76c..09b39cf 100644 --- a/claude-rules/todo-format.md +++ b/claude-rules/todo-format.md @@ -217,6 +217,7 @@ A completed sub-task disappears as a task and becomes an in-place event-log entr 2. Generate the timestamp with `date "+%Y-%m-%d %a @ %H:%M:%S %z"`. 3. Reword the original imperative title into the past-tense action that landed. Trim or restate if the original wording doesn't fit the action. 4. Drop the `TODO`/`DOING` keyword, the priority cookie, and the tags. The body stays as the record of what was done (if useful). +5. Remove any `SCHEDULED:`/`DEADLINE:` planning line. The completion time lives in the heading now, so `CLOSED:` is redundant and an active planning date on a historical log entry is always wrong. Org renders any headline carrying an active `<...>` `SCHEDULED`/`DEADLINE` on the agenda, keyword or not, so a stale one pins the finished entry there as weeks-overdue forever. An interactive close (`org-log-done`) stamps `CLOSED:` but never strips a pre-existing planning line, which is exactly how the stale dates survive. **Example:** @@ -226,7 +227,7 @@ becomes *** 2026-05-15 Fri @ 12:58:08 -0500 Wired yasnippet for universal availability -**Enforcement.** This is applied at close time by whoever closes the task, but an interactive org close (`org-log-done` flips the keyword to `DONE` and stamps `CLOSED:`) never applies the dated rewrite, so level-3+ closes accumulate as `DONE` keywords. `todo-cleanup.el --convert-subtasks` (run in the `clean-todo` and wrap-up cleanup passes) normalizes them mechanically: it rewrites any level-3+ `DONE`/`CANCELLED`/`FAILED` heading into the dated form above, pulling the timestamp from the `CLOSED` cookie and keeping the heading text verbatim (a batch tool can't reliably past-tense a title — polish wording by hand where it matters). `lint-org.el` flags any that slip through (checker `subtask-done-not-dated`). So the depth rule holds even when tasks are closed interactively rather than by an agent applying this section. +**Enforcement.** This is applied at close time by whoever closes the task, but an interactive org close (`org-log-done` flips the keyword to `DONE` and stamps `CLOSED:`) never applies the dated rewrite, so level-3+ closes accumulate as `DONE` keywords. `todo-cleanup.el --convert-subtasks` (run in the `clean-todo` and wrap-up cleanup passes) normalizes them mechanically: it rewrites any level-3+ `DONE`/`CANCELLED`/`FAILED` heading into the dated form above, pulling the timestamp from the `CLOSED` cookie, dropping the whole planning line (`CLOSED`, `SCHEDULED`, and `DEADLINE` together — step 5), and keeping the heading text verbatim (a batch tool can't reliably past-tense a title — polish wording by hand where it matters). `lint-org.el` flags any that slip through: checker `subtask-done-not-dated` for a still-keyworded sub-task, and `dated-log-heading-active-timestamp` for a dated entry that kept an active `SCHEDULED`/`DEADLINE`. So the depth rule holds even when tasks are closed interactively rather than by an agent applying this section. ### Why depth-based @@ -309,6 +310,10 @@ tasks — dated entries at `***` and deeper, terminal keyword at `**`. *** 2026-05-15 Fri @ 14:00:00 -0500 <what was answered or done> Generate the timestamp with `date "+%Y-%m-%d %a @ %H:%M:%S %z"`. + Remove any `SCHEDULED:`/`DEADLINE:` planning line too, same as the + sub-task rule above — a dated event-log entry carries its date in the + heading, and an active planning date left on it pins the finished entry + to the agenda forever. - **At `**` — terminal keyword, like any top-level task.** Change `VERIFY` to `DONE` (answered / check passed) or `CANCELLED` (abandoned), |
