diff options
Diffstat (limited to 'docs/specs')
| -rw-r--r-- | docs/specs/2026-06-16-autonomous-batch-execution-spec.org | 6 |
1 files changed, 3 insertions, 3 deletions
diff --git a/docs/specs/2026-06-16-autonomous-batch-execution-spec.org b/docs/specs/2026-06-16-autonomous-batch-execution-spec.org index 9563e33..a42adc3 100644 --- a/docs/specs/2026-06-16-autonomous-batch-execution-spec.org +++ b/docs/specs/2026-06-16-autonomous-batch-execution-spec.org @@ -21,7 +21,7 @@ |----------+--------------------------------------------------------------------| | Date | 2026-06-16 | |----------+--------------------------------------------------------------------| -| Related | [[file:../../working/inbox-zero-phase-e/proposed-inbox-zero.org][Phase E proposal]]; [[file:../design/2026-06-15-fix-speedrun-workflow-proposal.org][speedrun proposal]] | +| Related | [[file:../design/2026-06-16-inbox-zero-phase-e-proposal.org][Phase E proposal]]; [[file:../design/2026-06-15-fix-speedrun-workflow-proposal.org][speedrun proposal]] | |----------+--------------------------------------------------------------------| * Summary @@ -375,7 +375,7 @@ Verification is by invocation against a project's real =todo.org=: run the loop * References / Appendix -- [[file:../../working/inbox-zero-phase-e/proposed-inbox-zero.org][Phase E proposal (inbox-zero stopgap)]] and [[file:../../working/inbox-zero-phase-e/sender-note.org][its sender note with the 5 open questions]]. +- [[file:../design/2026-06-16-inbox-zero-phase-e-proposal.org][Phase E proposal (inbox-zero stopgap)]] and [[file:../design/2026-06-16-inbox-zero-phase-e-sender-note.org][its sender note with the 5 open questions]]. - [[file:../design/2026-06-15-fix-speedrun-workflow-proposal.org][speedrun proposal]] (file retains its original on-disk name pending a rename pass). - [[file:../../.ai/workflows/inbox.org][inbox.org (canonical A-D; was inbox-zero.org)]] — the routing workflow this feature decouples from. - =~/code/rulesets/claude-rules/knowledge-base.md= — the org-roam write contract the synthesis step follows. @@ -384,7 +384,7 @@ Verification is by invocation against a project's real =todo.org=: run the loop ** 2026-06-16 Tue — author - What: initial draft reconciling the Phase E and fix-speedrun proposals into one work-the-backlog.org feature, plus the effectiveness-measurement instrumentation. - Why: two overlapping proposals arrived within a day; building them separately would duplicate the execution loop and let it drift. Craig also asked explicitly for measurement + org-roam synthesis. -- Artifacts: this spec; the two source proposals under docs/design/ and working/inbox-zero-phase-e/. +- Artifacts: this spec; the two source proposals under docs/design/ (the Phase E proposal, diff, and sender note now filed there). ** 2026-06-28 Sun — revision (Craig) - What: removed the task-size gate (size no longer defers; large tasks decompose into per-commit chunks); recast the act-vs-file rule as a crisp four-item defer checklist keyed on test-writability; added crisp =:solo:= / =:quick:= definitions destined for =todo-format.md= and made their assessment mandatory in task-review + task-audit; added the speedrun's pre-flight decision-gathering step (batch the quick questions up front, "skip this" drops a task, then run hands-off); renamed "fix speedrun" → "no-approvals speedrun" in prose. Status stays draft pending ratification of the revised decisions. - Why: the original criteria were adjectives, not checkable; the size gate forced Craig to stay at his desk for anything non-trivial, defeating the away-from-desk use case; and decision-needing tasks were over-deferred when many need only a quick upfront answer. |
