aboutsummaryrefslogtreecommitdiff
path: root/todo.org
diff options
context:
space:
mode:
Diffstat (limited to 'todo.org')
-rw-r--r--todo.org9
1 files changed, 3 insertions, 6 deletions
diff --git a/todo.org b/todo.org
index d551484..08f4c61 100644
--- a/todo.org
+++ b/todo.org
@@ -189,13 +189,10 @@ Craig's answer (2026-06-16): spec it. Phase E reconciles with the "fix speedrun"
:CREATED: [2026-06-13 Sat]
:LAST_REVIEWED: 2026-06-15
:END:
-Optional wrap-up step that surfaces filed keepers belonging to another project, recommends a destination, and batch-moves them into that project's =todo.org= Open Work section (transcript filing deferred to vNext). All six decisions resolved (Reading B: the router acts on session-filed keepers, separate from the inbox gate and from defer-and-stage). Spec ready for review.
+Optional wrap-up step that surfaces filed keepers belonging to another project, recommends a destination, and routes each to that project's =inbox/= via =inbox-send= (the destination's own =process-inbox= files it; transcript filing deferred to vNext). Spec: [[file:docs/design/wrapup-routing-spec.org]] — Ready, [9/9] decisions. Source proposal: [[file:docs/design/2026-06-13-wrapup-inbox-transcript-routing-proposal.org]].
-Spec: [[file:docs/design/wrapup-routing-spec.org]]. Source proposal: [[file:docs/design/2026-06-13-wrapup-inbox-transcript-routing-proposal.org]] (archsetup handoff 2026-06-13). Next: =spec-review=.
-
-#+begin_src cj: comment
- I approved the spec in the spec document. please take it through the rest of the spec response process to implementation. bp
-#+end_src
+*** 2026-06-21 Sun @ 02:06:37 -0400 Spec-review + spec-response complete — Ready
+Craig's review challenge reshaped the design from a direct cross-repo =todo.org= move to =inbox-send= delivery into the destination's inbox (safer: reuses the sanctioned cross-project path, gets provenance + per-project filing for free, degrades gracefully where a destination has an =inbox/= but no =todo.org=). D2/D3 superseded; D7 (inbox-send delivery), D8 (=:ROUTE_CANDIDATE:= marker at file time), D9 (local source removal + reject-flow recovery) added. Spec-review file consumed and deleted. Next: Phase 6 implementation-task breakdown, then build (spec Phases 1-4).
** DONE [#C] Encourage org-roam KB contribution across workflows :feature:
CLOSED: [2026-06-20 Sat]