| |
|
|
|
|
|
|
|
|
| |
The audit found three tasks code-complete with only validation left, so I closed each and flipped its spec to IMPLEMENTED:
- Docs-lifecycle convention: all four build phases plus the file-to-id link conversion had shipped. Manual validation and the org-agenda vNext moved out to their own tasks.
- Wrap-up inbox/transcript routing: the recommendation engine, the route-candidate marker, the wrap-up router, and route-batch all shipped green. Manual end-to-end validation and transcript filing moved out.
- Cross-machine memory sync: verified the sync round-trip live across velox and ratio (a probe made on one reached the other, its deletion propagated back, both clones on one HEAD, no conflicts). The work and unknown-project write-refusal checks moved out.
I also stamped the audit marker.
|
|
|
Five specs moved to docs/specs/ with confirmed lifecycle keywords: agent-knowledge-base IMPLEMENTED (with the stated reason in its history line), inbox-workflow-consolidation READY, autonomous-batch-execution READY, encourage-kb-contribution READY, and wrapup-routing DOING. spec-sort recomputed twelve todo.org links and the moved specs' own outbound links, and stamped :LAST_SPEC_SORT:. The status board now answers "what's live" in one grep. The four -spec.org-named files in docs/design without a spec spine stay put as notes.
|