aboutsummaryrefslogtreecommitdiff
path: root/docs/specs/2026-07-01-docs-lifecycle-spec.org
diff options
context:
space:
mode:
authorCraig Jennings <c@cjennings.net>2026-07-04 12:38:46 -0500
committerCraig Jennings <c@cjennings.net>2026-07-04 12:38:46 -0500
commit44af1b2ae955a6deac3be75b5d3495b17c8b3ad9 (patch)
tree583955c52fb1124032c1276726f78c6620ce6443 /docs/specs/2026-07-01-docs-lifecycle-spec.org
parent73835a23d94f5746a085eaf444d657fecc9d3ca5 (diff)
downloadrulesets-44af1b2ae955a6deac3be75b5d3495b17c8b3ad9.tar.gz
rulesets-44af1b2ae955a6deac3be75b5d3495b17c8b3ad9.zip
chore(todo): close three tasks the audit confirmed done
The audit found three tasks code-complete with only validation left, so I closed each and flipped its spec to IMPLEMENTED: - Docs-lifecycle convention: all four build phases plus the file-to-id link conversion had shipped. Manual validation and the org-agenda vNext moved out to their own tasks. - Wrap-up inbox/transcript routing: the recommendation engine, the route-candidate marker, the wrap-up router, and route-batch all shipped green. Manual end-to-end validation and transcript filing moved out. - Cross-machine memory sync: verified the sync round-trip live across velox and ratio (a probe made on one reached the other, its deletion propagated back, both clones on one HEAD, no conflicts). The work and unknown-project write-refusal checks moved out. I also stamped the audit marker.
Diffstat (limited to 'docs/specs/2026-07-01-docs-lifecycle-spec.org')
-rw-r--r--docs/specs/2026-07-01-docs-lifecycle-spec.org5
1 files changed, 3 insertions, 2 deletions
diff --git a/docs/specs/2026-07-01-docs-lifecycle-spec.org b/docs/specs/2026-07-01-docs-lifecycle-spec.org
index dcf88c8..f5bfe63 100644
--- a/docs/specs/2026-07-01-docs-lifecycle-spec.org
+++ b/docs/specs/2026-07-01-docs-lifecycle-spec.org
@@ -4,10 +4,11 @@
#+TODO: TODO | DONE
#+TODO: DRAFT READY DOING | IMPLEMENTED SUPERSEDED CANCELLED
-* DOING Docs lifecycle
+* IMPLEMENTED Docs lifecycle
:PROPERTIES:
:ID: 80b0787b-4a60-4c82-8a16-b383d3e3c8f2
:END:
+- 2026-07-04 Sat @ 11:46:31 -0500 — DOING → IMPLEMENTED: all four build phases shipped (docs-lifecycle rule + spec-workflow updates, spec-sort helper + 30-test bats suite, rulesets pilot sorting the pile and standing up the status board, startup nudge gated on :LAST_SPEC_SORT:) plus the follow-up file:→id: link conversion. Remaining manual validation (startup nudge fires/clears, moved-spec links click through in Emacs) tracked as its own task; a failed check promotes to a bug.
- 2026-07-01 Wed @ 23:34:15 -0400 — READY → DOING: spec-response decomposition ran — build parent in todo.org carries the :SPEC_ID: binding, one task per phase plus the flip-to-IMPLEMENTED task and the manual-testing child. First live exercise of the transition-ownership table.
- 2026-07-01 Wed @ 23:22:50 -0400 — DRAFT → READY: Codex re-review found all fourteen review findings closed and no remaining blocking implementation-readiness gaps.
- 2026-07-01 Wed @ 22:54:41 -0400 — verify pass on the second responder round: all five fixes held, findings 1-9 unregressed, verdict ready; three minor nits folded in (scoped id-link criterion, untracked-copy cleanup in the recovery recipe, two stale prose spots). Stays DRAFT pending the reviewers' flip.
@@ -17,7 +18,7 @@
- 2026-07-01 Wed @ 22:13:00 -0400 — drafted from the five decisions settled 2026-06-28 (todo.org "Spec storage location + lifecycle-status convention").
* Metadata
-| Status | doing |
+| Status | implemented |
|----------+------------------------------------------------------------------|
| Owner | Craig Jennings |
|----------+------------------------------------------------------------------|