aboutsummaryrefslogtreecommitdiff
path: root/docs/specs/2026-07-01-docs-lifecycle-spec.org
diff options
context:
space:
mode:
Diffstat (limited to 'docs/specs/2026-07-01-docs-lifecycle-spec.org')
-rw-r--r--docs/specs/2026-07-01-docs-lifecycle-spec.org5
1 files changed, 3 insertions, 2 deletions
diff --git a/docs/specs/2026-07-01-docs-lifecycle-spec.org b/docs/specs/2026-07-01-docs-lifecycle-spec.org
index dcf88c8..f5bfe63 100644
--- a/docs/specs/2026-07-01-docs-lifecycle-spec.org
+++ b/docs/specs/2026-07-01-docs-lifecycle-spec.org
@@ -4,10 +4,11 @@
#+TODO: TODO | DONE
#+TODO: DRAFT READY DOING | IMPLEMENTED SUPERSEDED CANCELLED
-* DOING Docs lifecycle
+* IMPLEMENTED Docs lifecycle
:PROPERTIES:
:ID: 80b0787b-4a60-4c82-8a16-b383d3e3c8f2
:END:
+- 2026-07-04 Sat @ 11:46:31 -0500 — DOING → IMPLEMENTED: all four build phases shipped (docs-lifecycle rule + spec-workflow updates, spec-sort helper + 30-test bats suite, rulesets pilot sorting the pile and standing up the status board, startup nudge gated on :LAST_SPEC_SORT:) plus the follow-up file:→id: link conversion. Remaining manual validation (startup nudge fires/clears, moved-spec links click through in Emacs) tracked as its own task; a failed check promotes to a bug.
- 2026-07-01 Wed @ 23:34:15 -0400 — READY → DOING: spec-response decomposition ran — build parent in todo.org carries the :SPEC_ID: binding, one task per phase plus the flip-to-IMPLEMENTED task and the manual-testing child. First live exercise of the transition-ownership table.
- 2026-07-01 Wed @ 23:22:50 -0400 — DRAFT → READY: Codex re-review found all fourteen review findings closed and no remaining blocking implementation-readiness gaps.
- 2026-07-01 Wed @ 22:54:41 -0400 — verify pass on the second responder round: all five fixes held, findings 1-9 unregressed, verdict ready; three minor nits folded in (scoped id-link criterion, untracked-copy cleanup in the recovery recipe, two stale prose spots). Stays DRAFT pending the reviewers' flip.
@@ -17,7 +18,7 @@
- 2026-07-01 Wed @ 22:13:00 -0400 — drafted from the five decisions settled 2026-06-28 (todo.org "Spec storage location + lifecycle-status convention").
* Metadata
-| Status | doing |
+| Status | implemented |
|----------+------------------------------------------------------------------|
| Owner | Craig Jennings |
|----------+------------------------------------------------------------------|